Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07385
Well Classification: GW Status: PR - 6/1/2019
Well Name/No:SHAEFFER #12-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2019
FacilityID:89055LocationID:334565
County:GARFIELD #045Location:NWNW 13 7S93W 6
Field:MAMM CREEK - #52500Elevation:6307 ft.
Basin:PICEANCE BASIN  
Planned Location:696FNL  892 FWLLat/Long: 39.451019 / -107.729818Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.451120 / -107.729740Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2019             Measured TD: 7350 ft.    Vertical TD: 7019 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2019
Wellbore PermitDIRECTIONAL
Permit #:990376 Expiration Date:6/6/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 52678, Drill Unit: U

Wellbore Completed
Completion Date:1/22/2000
Spud Date:9/30/1999Spud Date Is:ACTUAL
Measured TD:7350 ft.Measured PB depth:7181 ft.
True Vertical TD:7019 ft.True Vertical PB depth:
Bottom Hole Location:Sec: Twp: Footage: 647 FSL  1968 FWL
Log Types:CBL,CN/LD/GR, AI/GR
Log Types:CBL, CN/LD/GR,AI/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 781 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 781 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7350 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 2050 ft., Bottom: 7350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3492 ft.4227 ft.NN
OHIO CREEK4227 ft.4952 ft.NN
WILLIAMS FORK4952 ft.5490 ft.NN
UNKNOWN5490 ft.5893 ft.NN
COZZETTE5893 ft.6610 ft.NN
CORCORAN6610 ft.7254 ft.NN
WILLIAMS FORK - CAMEO SD7254 ft.NN
COAL7254 ft.NN
WILLIAMS FK-ROLLINS-CAMEO7350 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/1/2019                  Interval Top: 4952 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:11/12/1999Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/22/2000
Treatment Summary:STAGE 1; ACID REAKDOWN PERFS 6842'-7115' W/36 BBLS OF 7 1/2% ACID W/78 BIO BALL SEALERS. STAGE1:FRACED PERFS 6842-7116' 98,057 LBS OF 20/40 WHITE SAND AND 1,041 BBLS VISTAR 16 FLUID. STAGE 2; FRACED PERFS 6383-6668' W284,500 LBS OF 20/40 WHITE SAND & 2560
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 3
CALC_BBLS_H2O 7
CALC_BBLS_OIL 0
CALC_GOR 90850
CALC_MCF_GAS 631
CASING_PRESS 345
MCF_GAS 636
TUBING_PRESS 275
No Perforation Data was found for formation WMFK.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)9573
GOR455857
GOR DeterminationMCFE
Average BOE per Day4.586
Average MCFE per Day26.559

 Federal Financial Assurance  i Y

 Tribal Well  i No