Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07360
Well Classification: GW Status: PR - 6/27/1999
Well Name/No:CLOUGH #RMV 205-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/27/1999
FacilityID:211599LocationID:324057
County:GARFIELD #045Location:SWNW 20 6S94W 6
Field:RULISON - #75400Elevation:5540 ft.
Basin:PICEANCE BASIN  
Planned Location:2400FNL  202 FWLLat/Long: 39.511029 / -107.920491Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.511096 / -107.920486Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/27/1999             Measured TD: 7926 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/27/1999
Wellbore Permit
Permit #:990032 Expiration Date:1/21/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-33 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:6/26/1999
Spud Date:4/2/1999Spud Date Is:ACTUAL
Measured TD:7926 ft.Measured PB depth:7829 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DISDDSN,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1063 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 1063 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7829 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 4670 ft., Bottom: 7829 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2090 ft.NN
MESAVERDE4467 ft.NN
CAMEO COAL7118 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/27/1999                 Interval Top: 5650 ft.    Interval Bottom: 7767 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/27/1999Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7131 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 3
CALC_BBLS_H2O 10
CALC_BBLS_OIL 3
CALC_GOR 665000
CALC_MCF_GAS 1995
CASING_PRESS 2525
MCF_GAS 1995
TUBING_PRESS 2417
Perforation Data:
Interval Top:5650 ft.# Of Holes:78
Interval Bottom:7767 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)10072
GOR774769
GOR DeterminationMCFE
Average BOE per Day4.797
Average MCFE per Day27.806

 Federal Financial Assurance  i 

 Tribal Well  i No