Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07338
Well Classification: GW Status: PR - 11/28/2012
Well Name/No:S. PARACHUTE FEDERAL #29-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 01523
Facility Status:PRStatus Date11/28/2012
FacilityID:211577LocationID:334681
County:GARFIELD #045Location:SENW 29 7S95W 6
Field:PARACHUTE - #67350Elevation:6037 ft.
Basin:PICEANCE BASIN  
Planned Location:1883FNL  1528 FWLLat/Long: 39.410490 / -108.024703Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.410500 / -108.024810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2012             Measured TD: 6660 ft.    Vertical TD: 6600 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2012
Wellbore Permit
Permit #:20031611 Expiration Date:9/14/2004
Proposed Depth/Form:6650 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CCRMV , Formation: COZZ-CRCRN-RLNS-MESAVERDE , Order: 139-31 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-31 , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:1/10/2004
Spud Date:11/6/2003Spud Date Is:ACTUAL
Measured TD:6660 ft.Measured PB depth:
True Vertical TD:6600 ft.True Vertical PB depth:
Log Types:THERMAL MULTIGATE DECAY LITHO,CBL,CHI PROCESSED TRIPLE COMBO,BHC, DUAL SPAC NEUTRON
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1122 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 1122 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6653 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: , Bottom: 6660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WILLIAMS FORK3567 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/28/2012                Interval Top: 4517 ft.    Interval Bottom: 6420 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/11/2004Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:11/13/2012Treatment End Date:11/13/2012
Treatment Summary:CBP @ 4420' DRILLED OUT, TUBING LANDED AND THE WELL RETURNED TO PRODUCTION
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/11/2012
Treatment Summary:CBP SET AT 4420', TESTED TO 1500 PSI
Formation Treatment
Treatment Date:1/10/2004
Treatment Summary:SEE SCANNED DOC #01257324
Tubing Size:2.375 in.Tubing Setting Depth:5752 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 120
BBLS_OIL 0
CASING_PRESS 1125
MCF_GAS 1500
TUBING_PRESS 590
Perforation Data:
Interval Top:4517 ft.# Of Holes:224
Interval Bottom:6420 ft.Hole Size:3.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)9562
GOR415739
GOR DeterminationMCFE
Average BOE per Day4.579
Average MCFE per Day26.569

 Federal Financial Assurance  i Y

 Tribal Well  i No