|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/14/2001 Measured TD: 8450 ft. Vertical TD: 8450 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/14/2001 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 7/13/2001 | | Proposed Depth/Form: | 8450 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: COZZ , Formation: COZZETTE , Order: 139-14 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: CRCRN , Formation: CORCORAN , Order: 139-14 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-33 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 10.75 in., Top: , Depth: 1120 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1120 ft. | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.875 in., Top: , Depth: 7916 ft., Weight: 26.7&29.7, Citings Type: PLANNED | | Cement: | Sacks: 1340, Top: , Bottom: | | Casing: | String Type: OPEN HOLE, Hole Size: 6.25 in., Size: , Top: , Depth: 8450 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 10/11/2000 | | Spud Date: | 12/1/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 8450 ft. | Measured PB depth: | 7652 ft. | | True Vertical TD: | 8450 ft. | True Vertical PB depth: | | | Log Types: | DISDDSN | | Log Types: | DUAL INDCTION SPECTRAL DENSITY DUAL SPACED NEUTRON,CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 10.75 in., Top: , Depth: 1120 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: , Bottom: 1120 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: , Depth: 7916 ft., Weight: 29.7 , Citings Type: ACTUAL | | Cement: | Sacks: 1340, Top: 5350 ft., Bottom: 7916 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 9.875 in., Size: 7.875 in., Top: , Depth: 7916 ft., Weight: 26.7 , Citings Type: ACTUAL | | Cement: | Sacks: 1340, Top: , Bottom: , Determination Method: | | Casing: | String Type: 3RD, Hole Size: 6.25 in., Size: 3.5 in., Top: , Depth: 9593 ft., Weight: 12.95 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1565 ft. | | N | N | | MESAVERDE | 3990 ft. | | N | N | | CAMEO COAL | 6708 ft. | | N | N | | ROLLINS | 7626 ft. | | N | N | | COZZETTE | 7978 ft. | | N | N | | CORCORAN | 8279 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 6/14/2001 Interval Top: 5686 ft. Interval Bottom: 7560 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/11/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6833 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/4/2000 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 20 | | CALC_MCF_GAS | 2198 | | CASING_PRESS | 2149 | | TUBING_PRESS | 1958 |
| | Perforation Data: | | Interval Top: | 5686 ft. | # Of Holes: | 66 | | Interval Bottom: | 7560 ft. | Hole Size: | |
|
Sidetrack #01 Wellbore Classification: GW Status: AB - 6/14/2001 Measured TD: 9595 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW AB - 6/14/2001 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/1/2014 | | Proposed Top PZ Location: | Sec:21 Twp: 6S 94W | Footage: 523 FSL 712 FWL | | Bottom Hole Location: | Sec:21 Twp: 6S 94W | Footage: 1569 FSL 1176 FWL | | Proposed Depth/Form: | 9139 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: COZZ , Formation: COZZETTE , Order: 139-14 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 10.75 in., Top: 0 ft., Depth: 1100 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7.625 in., Top: 0 ft., Depth: 7925 ft., Weight: 29.7 , Citings Type: PLANNED | | Cement: | Sacks: 1340, Top: 5350 ft., Bottom: 7925 ft. | | Casing: | String Type: OPEN HOLE, Hole Size: 6.25 in., Size: 6.25 in., Top: 7765 ft., Depth: 9139 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 7/21/1999 | | Spud Date: | 12/1/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 9595 ft. | Measured PB depth: | 8398 ft. | | True Vertical TD: | | True Vertical PB depth: | |
Formation CRCRN Formation Classification: GW Status: AB - 6/14/2001 Interval Top: 8584 ft. Interval Bottom: 9593 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CASING_PRESS | 1473 | | MCF_GAS | 37 | | TUBING_PRESS | 298 |
| | Perforation Data: | | Interval Top: | 8584 ft. | # Of Holes: | | | Interval Bottom: | 9593 ft. | Hole Size: | |
|
Sidetrack #02 Wellbore Classification: GW Status: PR - 6/1/2011 Measured TD: 9140 ft.| Wellbore Data for Sidetrack #02 | Wellbore Classification: GW PR - 6/1/2011 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/1/2014 | | Proposed Top PZ Location: | Sec:21 Twp: 6S 94W | Footage: 848 FSL 880 FWL | | Bottom Hole Location: | Sec:21 Twp: 6S 94W | Footage: 1704 FSL 1292 FWL | | Proposed Depth/Form: | 9595 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CRCRN , Formation: CORCORAN , Order: 139-14 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 10.75 in., Top: 0 ft., Depth: 1100 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7.625 in., Top: 0 ft., Depth: 7925 ft., Weight: 7925 , Citings Type: PLANNED | | Cement: | Sacks: 1340, Top: 5350 ft., Bottom: 7925 ft. | | Casing: | String Type: 2ND, Hole Size: 6.25 in., Size: 3.5 in., Top: 7989 ft., Depth: 9593 ft., Weight: 12.9 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 3/24/1999 | | Spud Date: | 12/1/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 9140 ft. | Measured PB depth: | 8069 ft. | | True Vertical TD: | | True Vertical PB depth: | |
Formation COZZ Formation Classification: GW Status: AB - 4/6/1999| Completed Information for Formation COZZETTE | | 1st Production Date: | 3/24/1999 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | No Perforation Data was found for formation COZZ. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 12 |
| Total Gas Produced (MCF) | 10461 |
| GOR | 871750 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.969 |
| Average MCFE per Day | 28.855 |
| Federal Financial Assurance | i | |
|
|