Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07279
Well Classification: GW Status: PR - 7/16/2009
Well Name/No:GIBSON GULCH UNIT #6-31 C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/16/2009
FacilityID:211519LocationID:334881
County:GARFIELD #045Location:SENW 31 6S91W 6
Field:MAMM CREEK - #52500Elevation:5990 ft.
Basin:PICEANCE BASIN  
Planned Location:2322FNL  1639 FWLLat/Long: 39.484791 / -107.600061Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.484856 / -107.600039Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/16/2009             Measured TD: 5437 ft.    Vertical TD: 5434 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/16/2009
Wellbore Permit
Permit #:000928 Expiration Date:9/7/2001
Proposed Depth/Form:5400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:GIBSON GULCH Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/5/2001
Spud Date:12/26/2000Spud Date Is:ACTUAL
Measured TD:5437 ft.Measured PB depth:5399 ft.
True Vertical TD:5434 ft.True Vertical PB depth:5399 ft.
Log Types:DIL / SDL / DSN, CBL-GR
Log Types:DIL / SDL / DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 620 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 675 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5436 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 850 ft., Bottom: 5436 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3339 ft.NN
OGALLALA3339 ft.3836 ft.NN
OHIO CREEK3339 ft.3836 ft.NN
WILLIAMS FORK3836 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/16/2009                 Interval Top: 3892 ft.    Interval Bottom: 5270 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:THROUGH TUBING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/5/2001
Treatment Summary:5035-5270 FRACED WITH 311600# 20/40 SAND+2017 BBLS.2% KCL WATER. 4440-4896 FRACED WITH 520000# 20/40 SAND+3927 BBLS. 2% KCL WATER. 3892-4214 FRACED WITH 308000# 20/40 SAND+2408 BBLS. 2% KCL WATER.
Tubing Size:2.375 in.Tubing Setting Depth:5160 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2001Test Method:TO PIPELINE
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 5
BTU_GAS 1160
CALC_BBLS_H2O 10
CALC_BBLS_OIL 5
CALC_GOR 270000
CALC_MCF_GAS 1350
CASING_PRESS 1710
GRAVITY_OIL 45
MCF_GAS 1350
TUBING_PRESS 1405
Perforation Data:
Interval Top:3892 ft.# Of Holes:18
Interval Bottom:5270 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)928
GOR464000
GOR DeterminationMCFE
Average BOE per Day0.444
Average MCFE per Day2.577

 Federal Financial Assurance  i 

 Tribal Well  i No