|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: Vertical TD: 7726 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 000955 | Expiration Date: | 9/12/2001 | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCMS , Formation: WILLIAMS FORK - CAMEO SD , Order: 139-28 , Unit Acreage: 640, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 11/6/2000 | | Spud Date: | 9/23/2000 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 7726 ft. | True Vertical PB depth: | | | Log Types: | DIL-FDC-CNL-SP-GR-CAL-CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1524 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 1524 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7726 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 6200 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 4735 ft. | N | N | | WILLIAMS FORK | 4735 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 5376 ft. Interval Bottom: 5876 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 2.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2000 | | Treatment Summary: | FRAC DOWN VIA DELTA SYSTEM W/104000# 103000# 20/40 SAND 30% N2 ASSIST FRAC DOWN 5 1/2" CSG VIA DELTA SYSTEM W/36000# 20/40 FRAC DOWN 5 1/2" CSG VIA DELTA SYSTEM W/44000# 20/40 SAND OTTOWA SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6200 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/7/2000 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 15 | | CALC_MCF_GAS | 950 | | CASING_PRESS | 1400 | | MCF_GAS | 950 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 5376 ft. | # Of Holes: | | | Interval Bottom: | 5876 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 5 |
| Total Gas Produced (MCF) | 1440 |
| GOR | 288000 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.696 |
| Average MCFE per Day | 4.026 |
| Federal Financial Assurance | i | Y |
|
|