Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06989
Well Classification: GW Status: PR - 9/11/2000
Well Name/No:FEDERAL #DOE 2-M-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/11/2000
FacilityID:211230LocationID:335235
County:GARFIELD #045Location:NWSW 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5449 ft.
Basin:PICEANCE BASIN  
Planned Location:2028FSL  772 FWLLat/Long: 39.478808 / -108.082496Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.478871 / -108.082488Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/31/1995             Measured TD: 7054 ft.    Vertical TD: 6593 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/31/1995
Wellbore PermitDIRECTIONAL
Permit #:950473 Expiration Date:11/28/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:C27743
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 479 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:5/31/1995
Spud Date:5/2/1995Spud Date Is:ACTUAL
Measured TD:7054 ft.Measured PB depth:3700 ft.
True Vertical TD:6593 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 327 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 150, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3541 ft.
CAMEO COAL6173 ft.

Formation MVRD                     Formation Classification:  GW                     Status:  CM - 5/31/1995                 Interval Top: 3541 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:MESAVERDECommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MVRD.
No Perforation Data was found for formation MVRD.

Formation WFCM                     Formation Classification:  GW                     Status:  AB - 5/31/1995

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/31/1995
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Sidetrack #01             Wellbore Classification: GW             Status: PR - 9/11/2000             Measured TD: 7200 ft.    Vertical TD: 6822 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: GW        PR - 9/11/2000
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:N/A
Proposed Depth/Form:
Surface Mineral Owner Same:
Mineral Owner:Surface Owner:
Unit: Unit Number: 

Wellbore Completed
Completion Date:12/15/1998
Spud Date:5/2/1995Spud Date Is:ACTUAL
Measured TD:7200 ft.Measured PB depth:
True Vertical TD:6822 ft.True Vertical PB depth:

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/11/2000                 Interval Top: 5616 ft.    Interval Bottom: 7014 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/15/1998
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7023 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/19/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 22
CALC_BBLS_H2O 20
CALC_BBLS_OIL 22
CALC_GOR 98909
CALC_MCF_GAS 2176
CASING_PRESS 1780
MCF_GAS 2176
TUBING_PRESS 1680
Perforation Data:
Interval Top:5616 ft.# Of Holes:64
Interval Bottom:7014 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)12660
GOR791250
GOR DeterminationMCFE
Average BOE per Day6.022
Average MCFE per Day34.901

 Federal Financial Assurance  i Y

 Tribal Well  i No