|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/23/2022 Measured TD: Vertical TD: 6900 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/23/2022 | | Wellbore Permit | | | Permit #: | 990339 | Expiration Date: | 5/23/2000 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 0 , Unit Acreage: 52678, Drill Unit: U |
| | |
| Wellbore Completed | | Completion Date: | 12/9/1999 | | Spud Date: | 6/9/1999 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 6900 ft. | True Vertical PB depth: | 6838 ft. | | Log Types: | AIGR, CNGR, PELQC,AI/GR,CBL | | Log Types: | CBL,CN/LD/GR, AI/GR | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 710 ft., Weight: 32# , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 710 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6900 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1075, Top: 3750 ft., Bottom: 6900 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 3080 ft. | 3798 ft. | N | N | | OHIO CREEK | 3798 ft. | 4382 ft. | N | N | | WILLIAMS FORK | 4382 ft. | 4866 ft. | N | N | | COAL | 6680 ft. | 6898 ft. | N | N |
Formation MVRD Formation Classification: GW Status: CM - 6/1/2002 Interval Top: 6118 ft. Interval Bottom: 6331 ft.| Completed Information for Formation MESAVERDE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MESAVERDE | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 10/3/1999 | | Treatment Summary: | 6326-31' w/ 7bbls 7.5% HCl Acid. 6118-26' & 6137-41' w/ 14bbls of 7.5% HCl Acid. Stimulate w/ 129,636 lbs of 20/40 Jordan Sand. 1132 bbl slurry. |
| | Tubing Size: | 1.9 in. | Tubing Setting Depth: | 5998 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 3 | | CALC_MCF_GAS | 117 | | CASING_PRESS | 500 | | MCF_GAS | 117 | | TUBING_PRESS | 170 |
| | Perforation Data: | | Interval Top: | 6118 ft. | # Of Holes: | 22 | | Interval Bottom: | 6331 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: AB - 11/13/2013 Interval Top: 5306 ft. Interval Bottom: 6331 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/16/2013 | Treatment End Date: | 10/16/2013 | | Treatment Summary: | abandoned with CIBP @ 5236' and topped with 2 sx cement | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 12/9/1999 | | Treatment Summary: | STAGE 1;PERFS 6188'-6331' ACID BREAKDOWN; 21 BBLS 7-1/2% HCI ACID. FRAC; 129,636 LBS OF 20/40 JORDAN SAND&1132 SLURRY. STAGE 2;PERFS 5669'-5997' ACID BREAKDOWN; 30 BBLS 7- 1/2% ACID. FRAC;1383 BBLS VISTAR 16 FLUID&144,638 LBS 20/40 WHITE SAND. STAGE 3; |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 98 | | CALC_MCF_GAS | 197 | | CASING_PRESS | 300 | | MCF_GAS | 197 | | TUBING_PRESS | 230 |
| | Perforation Data: | | Interval Top: | 5306 ft. | # Of Holes: | 72 | | Interval Bottom: | 6331 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/23/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|