|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2019 Measured TD: 8892 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2019 | | Wellbore Permit | | | Permit #: | 941137 | Expiration Date: | 2/22/1995 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: 0 , Unit Acreage: 9473, Drill Unit: U |
| | |
| Wellbore Completed | | Completion Date: | 11/29/1994 | | Measured TD: | 8892 ft. | Measured PB depth: | 8794 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 508 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8892 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OHIO CREEK | 3650 ft. | | | | | MESAVERDE | 5170 ft. | | | | | CAMEO | 8126 ft. | | | | | ROLLINS | 8838 ft. | | | |
Formation MVRD Formation Classification: GW Status: PR - 7/1/2019 Interval Top: 5170 ft.| Completed Information for Formation MESAVERDE | | 1st Production Date: | 11/30/1994 | Choke Size: | 1,464.000 in. | | Formation Name: | MESAVERDE | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MVRD. |
| | No Perforation Data was found for formation MVRD. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 50 |
| Total Gas Produced (MCF) | 6412 |
| GOR | 128240 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.173 |
| Average MCFE per Day | 18.413 |
| Federal Financial Assurance | i | |
|
|