Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06876
Well Classification: GW Status: PR - 9/29/1994
Well Name/No:DRY FORK FEDERAL #11-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:12450
Facility Status:PRStatus Date9/29/1994
FacilityID:211117LocationID:323897
County:GARFIELD #045Location:SESW 11 8S98W 6
Field:SOUTH SHALE RIDGE - #77760Elevation:5316 ft.
Basin:PICEANCE BASIN  
Planned Location:828FSL  1363 FWLLat/Long: 39.369119 / -108.300521Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.369012 / -108.299338Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/29/1994             Measured TD: 8390 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/29/1994
Wellbore Permit
Permit #:940851 Expiration Date:12/28/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:C-29975
Formation And Spacing:Code: DK-CM , Formation: DAKOTA-CEDAR MOUNTAIN , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:7/2/1994Spud Date Is:ACTUAL
Measured TD:8390 ft.Measured PB depth:8346 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 849 ft., Weight: 24 , Citings Type: HISTORICAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 849 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8390 ft., Weight: 11.6 , Citings Type: HISTORICAL
Cement:Sacks: 298, Top: 6970 ft., Bottom: 8390 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: 0 ft., Depth: 3991 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 300, Top: 3280 ft., Bottom: 4040 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
CAMEO2938 ft.
ROLLINS3284 ft.
COZZETTE3486 ft.
CORCORAN3688 ft.
FRONTIER7740 ft.
DAKOTA8054 ft.
MORRISON8290 ft.

Formation DK-CM                   Formation Classification:  GW                   Status:  CM - 11/6/2000                 Interval Top: 8116 ft.    Interval Bottom: 8266 ft.

 Completed Information for Formation DAKOTA-CEDAR MOUNTAIN
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:DAKOTA-CEDAR MOUNTAINCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DK-CM.
Perforation Data:
Interval Top:8116 ft.# Of Holes:86
Interval Bottom:8266 ft.Hole Size:0.38 in.

Formation DKTA                     Formation Classification:  GW                     Status:  PR - 2/1/2011                  Interval Top: 8054 ft.    Interval Bottom: 8266 ft.

 Completed Information for Formation DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTACommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
No Perforation Data was found for formation DKTA.

Formation CDMTN                   Formation Classification:  GW                   Status:  PR - 5/15/2001

 Completed Information for Formation CEDAR MOUNTAIN
1st Production Date:N/AChoke Size: 
Formation Name:CEDAR MOUNTAINCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CDMTN.
No Perforation Data was found for formation CDMTN.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)88516
GOR
GOR DeterminationMCFE
Average BOE per Day41.857
Average MCFE per Day242.774

 Federal Financial Assurance  i Y

 Tribal Well  i No