Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06862
Well Classification: GW Status: PA - 1/26/2011
Well Name/No:DOE #1-M-18ST
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:12495
Facility Status:PAStatus Date1/26/2011
FacilityID:211103LocationID:335744
County:GARFIELD #045Location:NENE 18 6S94W 6
Field:RULISON - #75400Elevation:6170 ft.
Basin:PICEANCE BASIN  
Planned Location:180FNL  34 FELLat/Long: 39.531579 / -107.921511Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.531710 / -107.921438Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/11/2010             Measured TD: 8976 ft.    Vertical TD: 8841 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/11/2010
Wellbore PermitDIRECTIONAL
Permit #:940788 Expiration Date:12/24/1994
Proposed Depth/Form:9050 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:NAVAL RES.#3
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:6/24/1995
Spud Date:11/8/1994Spud Date Is:ACTUAL
Measured TD:8976 ft.Measured PB depth:8847 ft.
True Vertical TD:8841 ft.True Vertical PB depth:8725 ft.
Casing:String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: , Depth: 40 ft., Weight: 31.7 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 31.75 , Citings Type: HISTORICAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 924 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 924 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 924 ft., Weight: 36 , Citings Type: HISTORICAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 924 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 8976 ft., Weight: 17, 23 , Citings Type: ACTUAL
Cement:Sacks: 2250, Top: 7200 ft., Bottom: 8976 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8976 ft., Weight: 17-23 , Citings Type: HISTORICAL
Cement:Sacks: 2850, Top: 1600 ft., Bottom: 8976 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 3340 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2850, Top: 1600 ft., Bottom: 3340 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5272 ft.
CAMEO COAL8018 ft.

Formation CMEOC                   Formation Classification:  GW                   Status:  AB - 5/18/1995                 Interval Top: 8509 ft.    Interval Bottom: 8819 ft.

 Completed Information for Formation CAMEO COAL
1st Production Date:3/29/1995Choke Size:1.000 in.
Formation Name:CAMEO COALCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 78
CASING_PRESS 260
MCF_GAS 78
TUBING_PRESS 650
Perforation Data:
Interval Top:8509 ft.# Of Holes:168
Interval Bottom:8819 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  AB - 1/26/2010                 Interval Top: 6546 ft.    Interval Bottom: 8380 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/24/1995Choke Size:2,464.000 in.
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/26/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 168
BBLS_OIL 10.4
CALC_BBLS_H2O 168
CALC_BBLS_OIL 10.4
CALC_GOR 128000
CALC_MCF_GAS 1280
CASING_PRESS 2000
MCF_GAS 1280
TUBING_PRESS 1175
Perforation Data:
Interval Top:6546 ft.# Of Holes:214
Interval Bottom:8380 ft.Hole Size:0.52 in.

Sidetrack #01             Wellbore Classification: GW             Status: PA - 6/11/2010             Measured TD: 9157 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: GW        PA - 6/11/2010
Wellbore PermitDIRECTIONAL
Permit #:500001 Expiration Date:1/1/1951
Proposed Depth/Form:9050 ft.
Surface Mineral Owner Same:
Mineral Owner:Surface Owner:
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 440-15 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:12/12/1994
Spud Date:11/8/1994Spud Date Is:ACTUAL
Measured TD:9157 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
  No formation data to display.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/26/2011
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No