|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2024 Measured TD: 10211 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/9/2014 | | Proposed Top PZ Location: | Sec:33 Twp: 6S 94W | Footage: 2452 FSL 945 FEL | | Bottom Hole Location: | Sec:33 Twp: 6S 94W | Footage: 917 FNL 1484 FWL | | Proposed Depth/Form: | 10211 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: COZZ , Formation: COZZETTE , Order: 139-22 , Unit Acreage: 640, Drill Unit: ALL | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-28 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: SURF, Hole Size: 10.75 in., Size: 14.75 in., Top: 0 ft., Depth: 4186 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 2272, Top: 0 ft., Bottom: 4186 ft. | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8186 ft., Weight: 26.4 , Citings Type: PLANNED | | Cement: | Sacks: 1080, Top: 4892 ft., Bottom: 8186 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.5 in., Size: 4.5 in., Top: 8050 ft., Depth: 9964 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 0, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 12/27/1992 | | Spud Date: | 10/20/1992 | Spud Date Is: | HISTORICAL | | Measured TD: | 10211 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:33 Twp: 6S 94W | Footage: 2452 FSL 945 FEL | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 4186 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 2272, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8186 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 9964 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 1598 ft. | | | | | MESAVERDE | 4022 ft. | | | | | CAMEO COAL | 7281 ft. | | | | | ROLLINS | 7603 ft. | | | | | BENTONITE | 7848 ft. | | | | | COZZETTE | 7947 ft. | | | |
Formation COZZ Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 8176 ft. Interval Bottom: 9923 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 1/27/1993 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8176 ft. | # Of Holes: | 1 | | Interval Bottom: | 9923 ft. | Hole Size: | 0.5 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 4/1/2024 Interval Top: 4967 ft. Interval Bottom: 7342 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 3/1/1996 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 4967 ft. | # Of Holes: | 72 | | Interval Bottom: | 7342 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 22 |
| Total Gas Produced (MCF) | 17265 |
| GOR | 784772 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.258 |
| Average MCFE per Day | 47.882 |
| Federal Financial Assurance | i | |
|
|