|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/22/2001 Measured TD: 5365 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/22/2001 | | Wellbore Permit | | | Permit #: | 901212 | Expiration Date: | 2/15/1991 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 11/3/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 5365 ft. | Measured PB depth: | 5224 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 301 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 301 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 301 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5351 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 3100 ft., Bottom: 5351 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5351 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 2450 ft., Depth: 2821 ft., Bottom: 2763 ft., Sacks: 140, Method: RETAINER | | Additional Cement: | String Type: 1ST , Top: 2070 ft., Depth: 2821 ft., Bottom: 2178 ft., Sacks: 50, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 2708 ft., Bottom: , Sacks: , Method: RETAINER | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 2288 ft. | | | | | CAMEO COAL | 4681 ft. | | | | | ROLLINS | 5107 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 5/22/2001| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.000 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 12 |
| Total Gas Produced (MCF) | 11652 |
| GOR | 971000 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.541 |
| Average MCFE per Day | 32.125 |
| Federal Financial Assurance | i | |
|
|