|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/18/1995 Measured TD: 7464 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/18/1995 | | Wellbore Permit | | | Permit #: | 900905 | Expiration Date: | 12/22/1990 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CMEOC , Formation: CAMEO COAL , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 8/18/1995 | | Spud Date: | 8/29/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 7464 ft. | Measured PB depth: | 5858 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 17.25 in., Size: 13.375 in., Top: 0 ft., Depth: 339 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 339 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1147 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 235, Top: 0 ft., Bottom: 1147 ft., Determination Method: VISU | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6825 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 4325 ft., Bottom: 6825 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 7 in., Top: , Depth: 3704 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 3704 ft., Determination Method: VISU | | Additional Cement: | String Type: 1ST , Top: , Depth: , Bottom: , Sacks: 25, Method: TOP OFF | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 1160 ft. | | | | | OHIO CREEK | 3864 ft. | | | | | MESAVERDE | 4084 ft. | | | | | CAMEO COAL | 6788 ft. | | | | | ROLLINS | 7428 ft. | | | |
Formation CMEOC Formation Classification: GW Status: AB - 8/18/1995 Interval Top: 6788 ft.| Completed Information for Formation CAMEO COAL | | 1st Production Date: | N/A | Choke Size: | 2,464.000 in. | | Formation Name: | CAMEO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEOC. |
| | No Perforation Data was found for formation CMEOC. |
|
Formation WMFK Formation Classification: GW Status: PR - 8/4/2009| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | No Perforation Data was found for formation WMFK. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1306 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.616 |
| Average MCFE per Day | 3.578 |
| Federal Financial Assurance | i | |
|
|