|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/16/2002 Measured TD: 6540 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/16/2002 | | Wellbore Permit | | | Permit #: | 900299 | Expiration Date: | 7/28/1990 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 9/14/2002 | | Spud Date: | 11/5/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 6540 ft. | Measured PB depth: | 6437 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CASED HOLE DUAL SPACED NEUTRON | | Casing: | String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 313 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 313 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6506 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 925, Top: 4210 ft., Bottom: 6506 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6506 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | | | | | WASATCH G | 1730 ft. | | N | N | | FORT UNION | 2030 ft. | | N | N | | MESAVERDE | 3387 ft. | | N | N | | CAMEO COAL | 5924 ft. | | N | N | | ROLLINS | 6399 ft. | | N | N |
Formation CMEOC Formation Classification: GW Status: CM - 5/30/1990 Interval Top: 5924 ft.| Completed Information for Formation CAMEO COAL | | 1st Production Date: | N/A | Choke Size: | 3,064.000 in. | | Formation Name: | CAMEO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEOC. |
| | No Perforation Data was found for formation CMEOC. |
|
Formation WFCM Formation Classification: GW Status: PR - 9/16/2002 Interval Top: 4961 ft. Interval Bottom: 6376 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 1.000 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2002 | | Treatment Summary: | |
| | Tubing Size: | 2.25 in. | Tubing Setting Depth: | 5606 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/16/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 136 | | CASING_PRESS | 466 | | MCF_GAS | 136 | | TUBING_PRESS | 231 |
| | Perforation Data: | | Interval Top: | 4961 ft. | # Of Holes: | 66 | | Interval Bottom: | 6376 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: CM - 9/4/2002 Interval Top: 4644 ft. Interval Bottom: 4835 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2002 | | Treatment Summary: | TREATED PERFORMATIONS IN OCT, 1997 W/1000 GAL 7.5% HCL, 502,070# 20/40 SAND & 2392 BBLS GEL. SQUEEZED OFF PERFS 8/28/02; 4644' & 4698'. SQUEEEZED OFF PERFS 9/4/02;4754&4834'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 4644 ft. | # Of Holes: | 16 | | Interval Bottom: | 4835 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2980 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.408 |
| Average MCFE per Day | 8.166 |
| Federal Financial Assurance | i | |
|
|