|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: PA - 4/23/2020 Measured TD: 3901 ft. Vertical TD: 3899 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW PA - 4/23/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 6/6/2015 | | Proposed Depth/Form: | 3901 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: 440-12 , Unit Acreage: 160, Drill Unit: Sec. 26:NW/4 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 13.375 in., Top: 0 ft., Depth: 29 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 29 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 315 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 315 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 3851 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: , Bottom: 3851 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/8/1989 | | Spud Date: | 9/7/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 3901 ft. | Measured PB depth: | 3690 ft. | | True Vertical TD: | 3899 ft. | True Vertical PB depth: | 3688 ft. | | Log Types: | DIL/GR; LPH/CDL/DR/CAL; CBL/CCL/GR; MUDLOG
ALL LOGS WERE SUBMITTED IN THE PAD WHEN WELL WAS DRILLED. | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 13.375 in., Top: 0 ft., Depth: 29 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 29 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 315 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 315 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 3851 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 2434 ft., Bottom: 3851 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2728 ft. | | | | | FORT UNION | 3013 ft. | | | |
Formation WSTC Formation Classification: GW Status: AB - 4/23/2020 Interval Top: 2666 ft. Interval Bottom: 2728 ft.| Completed Information for Formation WASATCH | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WASATCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2605 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WSTC. |
| | Perforation Data: | | Interval Top: | 2666 ft. | # Of Holes: | 372 | | Interval Bottom: | 2728 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/23/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|