|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 6/22/1998 Measured TD: 7110 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 6/22/1998 | | Wellbore Permit | | | Permit #: | 880726 | Expiration Date: | 11/12/1988 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 320, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/9/1988 | | Measured TD: | 7110 ft. | Measured PB depth: | 6922 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 355 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7080 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FORT UNION | 2337 ft. | | | | | MESAVERDE | 3855 ft. | | | | | CAMEO | 6498 ft. | | | | | ROLLINS | 6985 ft. | | | |
Formation CMEOC Formation Classification: GW Status: CM - 11/12/1988| Completed Information for Formation CAMEO COAL | | 1st Production Date: | N/A | Choke Size: | 864.000 in. | | Formation Name: | CAMEO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEOC. |
| | No Perforation Data was found for formation CMEOC. |
|
Formation WFCM Formation Classification: GW Status: PR - 6/22/1998| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/9/1988 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 17 |
| Total Gas Produced (MCF) | 7452 |
| GOR | 438352 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.563 |
| Average MCFE per Day | 20.690 |
| Federal Financial Assurance | i | |
|
|