Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06476
Well Classification: GW Status: PA - 8/26/2013
Well Name/No:CRYSTAL CREEK A-2 #MV 1-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:12703
Facility Status:PAStatus Date8/26/2013
FacilityID:210718LocationID:322524
County:GARFIELD #045Location:NWNW 23 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8550 ft.
Basin:PICEANCE BASIN  
Planned Location:605FNL  275 FWLLat/Long: 39.514047 / -108.195719Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.514013 / -108.195724Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/26/2013             Measured TD: 9877 ft.    Vertical TD: 9877 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/26/2013
Wellbore Permit
Permit #:840743 Expiration Date:10/16/1984
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 160, Drill Unit:

Wellbore Completed
Completion Date:10/3/1984
Measured TD:9877 ft.Measured PB depth:9743 ft.
True Vertical TD:9877 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 856 ft., Weight: 24# , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 856 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 9875 ft., Weight: 17 & 20# , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 4520 ft., Bottom: 9875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2498 ft.
LANCE5985 ft.
CAMEO8400 ft.
COZZETTE9154 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  AB - 8/23/2013                 Interval Top: 6905 ft.    Interval Bottom: 8799 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:6905 ft.# Of Holes:42
Interval Bottom:8799 ft.Hole Size:0.35 in.

Formation WSTC                     Formation Classification:  GW                     Status:  AB - 8/26/2013                 Interval Top: 4406 ft.    Interval Bottom: 4417 ft.

 Completed Information for Formation WASATCH
1st Production Date:N/AChoke Size: 
Formation Name:WASATCHCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WSTC.
Perforation Data:
Interval Top:4406 ft.# Of Holes:2
Interval Bottom:4417 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/26/2013
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No