Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-039-06703
Well Classification: OW Status: PR - 8/7/2022
Well Name/No:Redstone 6-65 24-36 #1HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:GMT EXPLORATION COMPANY LLC - 10243
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/7/2022
FacilityID:480083LocationID:479197
County:ELBERT #039Location:NESW 24 6S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:6278 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1436FSL  1808 FWLLat/Long: 39.510619 / -104.617930Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.510620 / -104.617930Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/17/2022
End Date: 6/30/2022
Reported: 11/16/2022
Days to report: 139
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/7/2022             Measured TD: 20860 ft.    Vertical TD: 8116 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/7/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/26/2024
Proposed Top PZ Location:Sec:24 Twp: 6S 65W Footage: 2029 FSL  600 FWL
Bottom Hole Location:Sec:36 Twp: 6S 65W Footage: 578 FSL  665 FWL
Proposed Depth/Form:20858 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1187 , Unit Acreage: 1600, Drill Unit: 25&36:All;24:S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2690 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 910, Top: 0 ft., Bottom: 2690 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20858 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3130, Top: , Bottom: 20858 ft.

Wellbore Completed
Completion Date:5/11/2022
Spud Date:4/27/2022Spud Date Is:ACTUAL
Measured TD:20860 ft.Measured PB depth:20830 ft.
True Vertical TD:8116 ft.True Vertical PB depth:8116 ft.
Top PZ Location:Sec:24 Twp: 6S 65WFootage: 2029 FSL  600 FWL
Bottom Hole Location:Sec:36 Twp: 6S 65WFootage: 578 FSL  665 FWL
Log Types:CBL, Mud Log, MWD/LWD (DIL in API 039-06704)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2729 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 0 ft., Bottom: 2729 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20846 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3082, Top: 800 ft., Bottom: 20846 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 80 ft., Depth: 650 ft., Bottom: 800 ft., Sacks: 428, Method: SQUEEZE
Additional Cement:String Type: SURF , Top: 80 ft., Depth: 248 ft., Bottom: 248 ft., Sacks: 271, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
DAWSON186 ft.
DENVER636 ft.
ARAPAHOE1491 ft.
FOX HILLS2256 ft.
PIERRE2658 ft.
SUSSEX3452 ft.
SHANNON5630 ft.
SHARON SPRINGS8214 ft.
NIOBRARA8241 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/7/2022                  Interval Top: 8803 ft.    Interval Bottom: 20783 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/17/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/17/2022Treatment End Date:6/30/2022
Treatment Summary:Completion type was a plug and perf, 60 intervals, max pressure 9,500 psi, main fluid type was LibertyFR, proppant type 40/70 white,100 mesh.
Total fluid used in treatment (bbls):646605Max pressure during treatment (psi):9500
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):1381Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):18486Total flowback volume recovered (bbls):86939
Fresh water used in treatment (bbls):626738Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20875551Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6278 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2022Test Method:Flowback
Hours Tested:9Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 387
CALC_BBLS_H2O 1032
CASING_PRESS 1254
TUBING_PRESS 1944
Perforation Data:
Interval Top:8803 ft.# Of Holes:2160
Interval Bottom:20783 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9540
Total Gas Produced (MCF)39436
GOR4133
GOR DeterminationBOE
Average BOE per Day44.523
Average MCFE per Day258.256

 Federal Financial Assurance  i 

 Tribal Well  i No