|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/15/2023 Measured TD: 20235 ft. Vertical TD: 8018 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/15/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/22/2026 | | Proposed Top PZ Location: | Sec:10 Twp: 6S 64W | Footage: 1516 FNL 1961 FWL | | Bottom Hole Location: | Sec:8 Twp: 6S 64W | Footage: 1502 FNL 550 FWL | | Proposed Depth/Form: | 20263 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1130 , Unit Acreage: 1600, Drill Unit: 8 & 9: All; 10: W/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2210 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 585, Top: 0 ft., Bottom: 2210 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20263 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3040, Top: , Bottom: 20263 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/11/2023 | | Spud Date: | 3/2/2023 | Spud Date Is: | ACTUAL | | Measured TD: | 20235 ft. | Measured PB depth: | 20165 ft. | | True Vertical TD: | 8018 ft. | True Vertical PB depth: | 8017 ft. | | Top PZ Location: | Sec:10 Twp: 6S 64W | Footage: 1579 FNL 1988 FWL | | Bottom Hole Location: | Sec:8 Twp: 6S 64W | Footage: 1592 FNL 572 FWL | | Log Types: | Mud Log, CBL, MWD/LWD, (RESISTIVTY in API 039-06688)
| | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2260 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 603, Top: 0 ft., Bottom: 2260 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20219 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3070, Top: 0 ft., Bottom: 20219 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | DAWSON | 140 ft. | | | | | DENVER | 210 ft. | | | | | ARAPAHOE | 1094 ft. | | | | | FOX HILLS | 1929 ft. | | | | | PIERRE | 2160 ft. | | | | | SUSSEX | 5369 ft. | | | | | SHARON SPRINGS | 7558 ft. | | | | | NIOBRARA | 7623 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 7/15/2023 Interval Top: 8185 ft. Interval Bottom: 20160 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/5/2023 | Choke Size: | 26.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/12/2023 | Treatment End Date: | 5/28/2023 | | Treatment Summary: | 311,239 bbls of LibertyFR, 16,937 bbls of Treated Water, 93 bbls of Biosuite GQ510X, 351 bbls FRP-1s, 245 bbls of SpearPoint- WL(Acid). 13,011,175 of Proppant used, 9,113,820
40/70 and 3,897,355 White 100 Mesh | | Total fluid used in treatment (bbls): | 328865 | Max pressure during treatment (psi): | 9500 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 60 | | Total acid used in treatment (bbls): | 245 | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 16937 | Total flowback volume recovered (bbls): | 17788 | | Fresh water used in treatment (bbls): | 311683 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 13011175 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7143 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/15/2023 | Test Method: | Flowback | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 646 | | BBLS_OIL | 74 | | BTU_GAS | 1025 | | CALC_BBLS_H2O | 646 | | CALC_BBLS_OIL | 74 | | CALC_GOR | 864 | | CALC_MCF_GAS | 64 | | CASING_PRESS | 1650 | | GRAVITY_OIL | 35 | | MCF_GAS | 64 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 8185 ft. | # Of Holes: | 1920 | | Interval Bottom: | 20160 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 18778 |
| Total Gas Produced (MCF) | 26331 |
| GOR | 1402 |
| GOR Determination | BOE |
| Average BOE per Day | 63.971 |
| Average MCFE per Day | 371.029 |
| Federal Financial Assurance | i | |
|
|