|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2025 Measured TD: 7750 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | 19810608 | Expiration Date: | 8/20/1981 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SENW |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/18/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 7750 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Radial Cement Bond Log | | Log Types: | SP-IES, FDC-GR-CALIPER LOG | | Casing: | String Type: SURF, Hole Size: 8.625 in., Size: 5.5 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 213 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 5.5 in., Size: 7.875 in., Top: 0 ft., Depth: 7750 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6400 ft., Bottom: 7750 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5010 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 4970 ft., Bottom: 5106 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1600 ft. | | | | | SUSSEX | 4570 ft. | | | | | SHANNON | 4950 ft. | | | | | NIOBRARA | 6806 ft. | | | | | CODELL | 7184 ft. | | | | | BENTONITE | 7457 ft. | | | | | D SAND | 7544 ft. | | | | | J SAND | 7594 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 10/1/2025 Interval Top: 7570 ft. Interval Bottom: 7670 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 10/13/1981 | Choke Size: | 0.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/9/1981 | | Treatment Summary: | SEE SCANNED DOCUMENT #00436684 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7547 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/15/1981 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 39 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 3333 | | CALC_MCF_GAS | 130 | | GRAVITY_OIL | 42.8 | | MCF_GAS | 130 |
| | Perforation Data: | | Interval Top: | 7570 ft. | # Of Holes: | 144 | | Interval Bottom: | 7670 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 91 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.249 |
| Average MCFE per Day | 1.445 |
| Federal Financial Assurance | i | |
|
|