Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-039-06334
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:CHAMPLIN 416 AMOCO C #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:209429LocationID:322162
County:ELBERT #039Location:SWSW 11 6S62W 6
Field:DOUBLETREE - #17550Elevation:5581 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  660 FWLLat/Long: 39.536947 / -104.308220Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.536940 / -104.308140Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 7290 ft.    Vertical TD: 7290 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore Permit
Permit #:19791254 Expiration Date:12/4/1997
Proposed Depth/Form:7150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: 80, Drill Unit: W2SW
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 80, Drill Unit: W2SW

Wellbore Completed
Completion Date:7/2/1980
Spud Date:12/18/1979Spud Date Is:ACTUAL
Measured TD:7290 ft.Measured PB depth:7247 ft.
True Vertical TD:7290 ft.True Vertical PB depth:
Log Types: SP-IES, FDC-GR CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 233 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7279 ft., Weight: 14 & 15.5, Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1088 ft.
SUSSEX4184 ft.
NIOBRARA6288 ft.
MUDDY D7039 ft.
MUDDY J7087 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 8/20/1996                 Interval Top: 7156 ft.    Interval Bottom: 7185 ft.

 Completed Information for Formation J SAND
1st Production Date:4/10/1980Choke Size:1.000 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/2/1980
Treatment Summary:SEE SCANNED DOCUMENT #00427448
Tubing Size:2.875 in.Tubing Setting Depth:7150 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/2/1980Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 238
BBLS_OIL 15
CALC_BBLS_H2O 238
CALC_BBLS_OIL 15
CALC_GOR 43333
CALC_MCF_GAS 650
GRAVITY_OIL 42
MCF_GAS 650
TUBING_PRESS 125
Perforation Data:
Interval Top:7156 ft.# Of Holes:116
Interval Bottom:7185 ft.Hole Size:

Formation DSND                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7098 ft.    Interval Bottom: 7106 ft.

 Completed Information for Formation D SAND
1st Production Date:N/AChoke Size: 
Formation Name:D SANDCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:7/2/1980
Treatment Summary:SEE SCANNED DOCUMENT #00427415
Tubing Size:2.375 in.Tubing Setting Depth:7135 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/1997Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 25
BTU_GAS 1300
CALC_BBLS_OIL 25
CALC_GOR 1000
CALC_MCF_GAS 25
CASING_PRESS 40
GRAVITY_OIL 42
MCF_GAS 25
TUBING_PRESS 40
Perforation Data:
Interval Top:7098 ft.# Of Holes:40
Interval Bottom:7106 ft.Hole Size:0.36 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)390
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day1.065
Average MCFE per Day6.176

 Federal Financial Assurance  i 

 Tribal Well  i No