Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-039-06296
Well Classification: OW Status: PR - 10/1/2018
Well Name/No:MORRIS #13-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2018
FacilityID:209392LocationID:322160
County:ELBERT #039Location:NWNW 13 6S63W 6
Field:COMANCHE CREEK - #11627Elevation:5862 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  660 FWLLat/Long: 39.533117 / -104.401463Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.533290 / -104.401620Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2018             Measured TD: 7844 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2018
Wellbore Permit
Permit #:19780269 Expiration Date:4/4/1979
Proposed Depth/Form:7830 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 80, Drill Unit: N2NW

Wellbore Completed
Completion Date:4/16/1978
Spud Date:4/8/1978Spud Date Is:ACTUAL
Measured TD:7844 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:Induction-Electrical-SP (4/15/1978); Compensated Formation Density-GR (4/15/1978); CBL (4/20/78)
Log Types: IES, FDC/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 204 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 204 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7836 ft., Weight: 11.6/10.5, Citings Type: ACTUAL
Cement:Sacks: 100, Top: 7320 ft., Bottom: 7836 ft., Determination Method: CBL
Additional Cement:String Type: S.C. 1.1 , Top: 0 ft., Depth: 3702 ft., Bottom: 3702 ft., Sacks: 500, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1450 ft.
SUSSEX4760 ft.
NIOBRARA6950 ft.
TIMPAS7285 ft.
GREENHORN7380 ft.
BENTONITE7590 ft.
D SAND7678 ft.
J SAND7706 ft.
SKULL CREEK7800 ft.

Formation DSND                     Formation Classification:  OW                     Status:  PR - 10/1/2018                 Interval Top: 7690 ft.    Interval Bottom: 7699 ft.

 Completed Information for Formation D SAND
1st Production Date:5/5/1978Choke Size:0.313 in.
Formation Name:D SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/8/1978
Treatment Summary:SEE SCANNED DOCUMENT #00432721
Tubing Size:2.375 in.Tubing Setting Depth:7687 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/1978Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:FLARED
Test TypeMeasure
BBLS_OIL 195
CALC_BBLS_OIL 195
CALC_GOR 897
CALC_MCF_GAS 175
CASING_PRESS 660
GRAVITY_OIL 37.4
MCF_GAS 175
TUBING_PRESS 200
Perforation Data:
Interval Top:7690 ft.# Of Holes:12
Interval Bottom:7699 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)606
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day1.662
Average MCFE per Day9.640

 Federal Financial Assurance  i 

 Tribal Well  i No