|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2018 Measured TD: 7844 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2018 | Wellbore Permit | | Permit #: | 19780269 | Expiration Date: | 4/4/1979 | Proposed Depth/Form: | 7830 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 80, Drill Unit: N2NW |
| | |
Wellbore Completed | Completion Date: | 4/16/1978 | Spud Date: | 4/8/1978 | Spud Date Is: | ACTUAL | Measured TD: | 7844 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Induction-Electrical-SP (4/15/1978); Compensated Formation Density-GR (4/15/1978); CBL (4/20/78) | Log Types: | IES, FDC/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 204 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 204 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7836 ft., Weight: 11.6/10.5, Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 7320 ft., Bottom: 7836 ft., Determination Method: CBL | Additional Cement: | String Type: S.C. 1.1 , Top: 0 ft., Depth: 3702 ft., Bottom: 3702 ft., Sacks: 500, Method: STAGE TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1450 ft. | | | | SUSSEX | 4760 ft. | | | | NIOBRARA | 6950 ft. | | | | TIMPAS | 7285 ft. | | | | GREENHORN | 7380 ft. | | | | BENTONITE | 7590 ft. | | | | D SAND | 7678 ft. | | | | J SAND | 7706 ft. | | | | SKULL CREEK | 7800 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 10/1/2018 Interval Top: 7690 ft. Interval Bottom: 7699 ft. Completed Information for Formation D SAND | 1st Production Date: | 5/5/1978 | Choke Size: | 0.313 in. | Formation Name: | D SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/8/1978 | Treatment Summary: | SEE SCANNED DOCUMENT #00432721 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7687 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/8/1978 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_OIL | 195 | CALC_BBLS_OIL | 195 | CALC_GOR | 897 | CALC_MCF_GAS | 175 | CASING_PRESS | 660 | GRAVITY_OIL | 37.4 | MCF_GAS | 175 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7690 ft. | # Of Holes: | 12 | Interval Bottom: | 7699 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 616 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 1.689 |
Average MCFE per Day | 9.795 |
Federal Financial Assurance | i | |
|
|