|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2022 Measured TD: 7760 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2022 | | Wellbore Permit | | | Permit #: | 19770668 | Expiration Date: | 7/7/1978 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 80, Drill Unit: W2NW |
| | |
| Wellbore Completed | | Completion Date: | 8/6/1977 | | Spud Date: | 7/28/1977 | Spud Date Is: | ACTUAL | | Measured TD: | 7760 ft. | Measured PB depth: | 7745 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Induction-Electric-SP (8/5/1977); Compensated Formation Density-GR (8/5/1977); CBL (8/18/1977); CBL (5/21/2007) | | Log Types: | Induction-Electric-SP (8/5/1977); Compensated Formation Density-GR (8/5/1977); CBL (8/18/1977); CBL (5/21/2007); 40 Arm Casing Caliper (5/1/2012); CBL (5/7/2012) | | Log Types: | IES, FDC/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 214 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7763 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6863 ft., Bottom: 7763 ft., Determination Method: CBL | | Additional Cement: | String Type: S.C. 1.1 , Top: 2275 ft., Depth: 2606 ft., Bottom: 2660 ft., Sacks: 400, Method: SQUEEZE | | Additional Cement: | String Type: S.C. 1.3 , Top: 3338 ft., Depth: , Bottom: 2985 ft., Sacks: 150, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1420 ft. | | | | | SUSSEX | 4670 ft. | | | | | NIOBRARA | 6885 ft. | | | | | GREENHORN | 7310 ft. | | | | | D SAND | 7605 ft. | | | | | J SAND | 7658 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 3/1/2022 Interval Top: 7616 ft. Interval Bottom: 7631 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 9/25/1977 | Choke Size: | 0.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/25/1977 | | Treatment Summary: | SEE SCANNED DOCUMENT #00445104 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7603 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/31/1977 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 83 | | CALC_BBLS_OIL | 83 | | CALC_GOR | 602 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 20 | | GRAVITY_OIL | 36 | | MCF_GAS | 50 | | TUBING_PRESS | 20 |
| | Perforation Data: | | Interval Top: | 7616 ft. | # Of Holes: | 30 | | Interval Bottom: | 7631 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 157 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.429 |
| Average MCFE per Day | 2.490 |
| Federal Financial Assurance | i | |
|
|