|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/22/2019 Measured TD: 8430 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/22/2019 | | Wellbore Permit | | | Permit #: | 19720002 | Expiration Date: | 1/2/1973 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: S2NW |
| | |
| Wellbore Completed | | Completion Date: | 1/7/1972 | | Spud Date: | 1/2/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 8430 ft. | Measured PB depth: | 8377 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | n/a | | Log Types: | IES,GR-CORR. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 338 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 338 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8430 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7120 ft., Bottom: 8430 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1653 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 1050 ft., Bottom: 1653 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3495 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 2150 ft., Bottom: 3650 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1653 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 1050 ft., Bottom: 1653 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 820 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1200, Top: 380 ft., Bottom: 820 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 8262 ft. | | | | | J SAND | 8312 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/22/2019 Interval Top: 8316 ft. Interval Bottom: 8352 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/16/1972 | Choke Size: | 1.000 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/7/1972 | | Treatment Summary: | 1500# 20-40 SD (3000 gal gelled oil)
7500# 20-40 SD (7500 gal gelled oil)
9000# 10-20 SD (9000 gal gelled oil)
2000# 8-12 beads (4000 gal gelled oil) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/1972 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 565 | | BTU_GAS | 1448 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 565 | | CALC_GOR | 2307 | | CALC_MCF_GAS | 411 | | CASING_PRESS | 250 | | GRAVITY_OIL | 41 | | MCF_GAS | 411 | | TUBING_PRESS | 125 |
| | Perforation Data: | | Interval Top: | 8316 ft. | # Of Holes: | 36 | | Interval Bottom: | 8352 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/22/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|