|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/29/2019 Measured TD: 8398 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/29/2019 | | Wellbore Permit | | | Permit #: | 19710883 | Expiration Date: | 11/10/1972 | | Proposed Depth/Form: | 8395 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-3 , Unit Acreage: 80, Drill Unit: E2SW |
| | |
| Wellbore Completed | | Completion Date: | 12/15/1971 | | Spud Date: | 11/13/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8398 ft. | Measured PB depth: | 8364 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 319 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 319 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8398 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6530 ft., Bottom: 8398 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1550 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 200 ft., Bottom: 1550 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 8216 ft. | | | | | J SAND | 8264 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 8/28/2016 Interval Top: 8290 ft. Interval Bottom: 8308 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/9/1971 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 12/1/1971 | | Treatment Summary: | Sand oil frac'd J Sand interval 8290' - 8308' w/4000# 20-40 sn, 5000# 10-20 sn and 1000# 8-12 beads in 17,000 gal |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8338 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/1971 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 335 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 335 | | CALC_GOR | 4716 | | CALC_MCF_GAS | 1580 | | CASING_PRESS | 575 | | GRAVITY_OIL | 36 | | MCF_GAS | 1580 | | TUBING_PRESS | 425 |
| | Perforation Data: | | Interval Top: | 8290 ft. | # Of Holes: | 58 | | Interval Bottom: | 8308 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/29/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|