Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/4/2022 | Treatment End Date: | 1/4/2022 |
Treatment Summary: | Reperforated 5303'-5311'. Acidized with 1000 gals 15% NEFE and 3 gals KLA-22. Displaced with 25 bbl 3% KCl. |
Total fluid used in treatment (bbls): | 56 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 32 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/8/2021 | Treatment End Date: | 1/8/2021 |
Treatment Summary: | Added perfs in Morrow Sand at 5234' -5254' to change gross perforated interval to 5234' - 5311'. Acidized new perfs w/ 500 gals 15% MCA. |
Total fluid used in treatment (bbls): | 43 | Max pressure during treatment (psi): | 1200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 37 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/16/2018 | Treatment End Date: | 7/16/2018 |
Treatment Summary: | Treated down backside w/ 500 gal 7 1/2% HCL acid. |
Total fluid used in treatment (bbls): | 95 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 83 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 5/8/2009 |
Treatment Summary: | SET CIBP @ 5290'. PERF'D 5268-5272' 94 SPF). SET MODEL R PACKER @ 5236' IN COMPRESSION (15,000#). SHUT WELL IN SITP 420#. |