|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2021 Measured TD: 5338 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2021 | Wellbore Permit | | Permit #: | 19900177 | Expiration Date: | 6/22/1990 | Prop Depth/Form: | 5375 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: 80, Drill Unit: N2SW |
| | |
Wellbore Completed | Completion Date: | 5/7/1990 | Spud Date: | 3/7/1990 | Spud Date Is: | ACTUAL | Measured TD: | 5338 ft. | Measured PB depth: | 5313 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CNL-DENSITY, DUAL INDUCTION | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 574 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5330 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 4800 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 600 ft. | | N | | FORT HAYS | 1324 ft. | | N | | CODELL | 1387 ft. | | N | | CARLILE | 1400 ft. | | N | | GREENHORN | 1567 ft. | | N | | DAKOTA | 1761 ft. | | N | | CHEYENNE | 2084 ft. | | N | | MORRISON | 2188 ft. | | N | | BLAINE | 2596 ft. | | N | | CEDAR HILLS | 2765 ft. | | N | | SHAWNEE | 4006 ft. | | N | | LANSING | 4275 ft. | | N | | MARMATON | 4652 ft. | | N | | CHEROKEE K | 4810 ft. | | N | | MORROW | 5099 ft. | | N | Y | KEYES | 5228 ft. | | N | | MISSISSIPPIAN | 5242 ft. | | N | | ST LOUIS | 5283 ft. | | N | |
Formation MRRW Formation Classification: OW Status: PR - 10/1/2021 Interval Top: 5205 ft. Interval Bottom: 5205 ft. Completed Information for Formation MORROW | 1st Production Date: | 5/9/1990 | Choke Size: | | Formation Name: | MORROW | Commingled: | No | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/7/1990 | Treatment Summary: | NONE |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/19/1990 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 45 | BBLS_OIL | 103 | CALC_BBLS_H2O | 45 | CALC_BBLS_OIL | 103 | CALC_GOR | 40.9 |
| Perforation Data: | Interval Top: | 5205 ft. | # Of Holes: | 12 | Interval Bottom: | 5205 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2007 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 5.483 |
Average MCFE per Day | 31.804 |
Federal Financial Assurance | i | |
|
|