|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2022 Measured TD: 5482 ft. Vertical TD: 5482 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2022 | Wellbore Permit | | Permit #: | 19890607 | Expiration Date: | 12/1/1989 | Prop Depth/Form: | 5500 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: 0 , Unit Acreage: 80, Drill Unit: W2SW |
| | |
Wellbore Completed | Completion Date: | 10/18/1989 | Spud Date: | 9/19/1989 | Spud Date Is: | ACTUAL | Measured TD: | 5482 ft. | Measured PB depth: | 5434 ft. | True Vertical TD: | 5482 ft. | True Vertical PB depth: | | Log Types: | SCHLUMBERGER: CNL-DENSITY, DUAL INDUCTION | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 519 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5478 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FORT HAYS | 1262 ft. | | | | CODELL | 1327 ft. | | | | GREENHORN | 1507 ft. | | | | DAKOTA | 1700 ft. | | | | CHEYENNE | 2029 ft. | | | | SHAWNEE | 4088 ft. | | | | LANSING | 4350 ft. | | | | MARMATON | 4726 ft. | | | | CHEROKEE K | 4897 ft. | | | | MORROW | 5174 ft. | | | | KEYES | 5334 ft. | | | | ST GENEVIEVE | 5365 ft. | | | |
Formation MRRW3 Formation Classification: GW Status: AB - 10/18/2001 Interval Top: 5286 ft. Interval Bottom: 5288 ft. Completed Information for Formation MORROW V-3 | 1st Production Date: | 10/18/2001 | Choke Size: | | Formation Name: | MORROW V-3 | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/1989 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/17/2001 | Test Method: | SWABBING | Hours Tested: | 1 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 26 | CALC_BBLS_H2O | 624 |
| Perforation Data: | Interval Top: | 5286 ft. | # Of Holes: | 9 | Interval Bottom: | 5288 ft. | Hole Size: | 4 in. |
|
Formation MRRW Formation Classification: GW Status: PR - 9/1/2022 Interval Top: 5274 ft. Interval Bottom: 5332 ft. Completed Information for Formation MORROW | 1st Production Date: | 10/18/1989 | Choke Size: | | Formation Name: | MORROW | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 4/13/2020 | Treatment End Date: | N/A | Treatment Summary: | Drilled out existing CIBP that was located at 5283' to change producing interval from 5274'-5278' to 5274'-5288'. Overall perforated interval for the Morrow formation is down to 5332', but perforations at 5328'-5332' are temporarily abandoned with a CIBP at 5318'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 10/18/1989 | Treatment Summary: | |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5289 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 13 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 13 | CALC_GOR | 14307 | CALC_MCF_GAS | 186 | GRAVITY_OIL | 41 | MCF_GAS | 186 |
| Perforation Data: | Interval Top: | 5274 ft. | # Of Holes: | 50 | Interval Bottom: | 5332 ft. | Hole Size: | 0.52 in. |
|
Formation MRRWA Formation Classification: GW Status: AB - 10/5/2001 Interval Top: 5268 ft. Interval Bottom: 5272 ft. Completed Information for Formation MORROW A | 1st Production Date: | 10/5/2001 | Choke Size: | | Formation Name: | MORROW A | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/1989 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MRRWA. |
| Perforation Data: | Interval Top: | 5268 ft. | # Of Holes: | | Interval Bottom: | 5272 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 372 |
Total Gas Produced (MCF) | 182340 |
GOR | 490161 |
GOR Determination | MCFE |
Average BOE per Day | 86.905 |
Average MCFE per Day | 504.066 |
Federal Financial Assurance | i | |
|
|