Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20846
Well Classification: OW Status: PR - 10/13/2019
Well Name/No:Interchange B #N35-20-2C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2019
FacilityID:463344LocationID:456747
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 10 1S68W 6
Field:WATTENBERG - #90750Elevation:5213 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2479FSL  1567 FWLLat/Long: 39.978930 / -104.991593Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978930 / -104.991592Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/15/2019
End Date: 7/24/2019
Reported: 7/29/2019
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/13/2019             Measured TD: 18618 ft.    Vertical TD: 8046 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/13/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2021
Proposed Top PZ Location:Sec:3 Twp: 1S 68W Footage: 150 FSL  2517 FWL
Bottom Hole Location:Sec:34 Twp: 1N 68W Footage: 460 FNL  2317 FEL
Proposed Depth/Form:18662 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18662 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2501, Top: , Bottom: 18662 ft.

Wellbore Completed
Completion Date:5/2/2019
Spud Date:4/3/2019Spud Date Is:ACTUAL
Measured TD:18618 ft.Measured PB depth:18602 ft.
True Vertical TD:8046 ft.True Vertical PB depth:8046 ft.
Top PZ Location:Sec:3 Twp: 1S 68WFootage: 192 FSL  2515 FWL
Bottom Hole Location:Sec:34 Twp: 1N 68WFootage: 506 FNL  2339 FEL
Log Types:CBL, Mud Log, MWD/LWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1642 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1642 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18607 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2910, Top: 386 ft., Bottom: 18618 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4850 ft.NN
SUSSEX5241 ft.NN
SHANNON5804 ft.NN
SHARON SPRINGS8161 ft.NN
NIOBRARA8214 ft.NN
FORT HAYS8761 ft.NN
CODELL8821 ft.NN
CARLILE8883 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/6/2019                 Interval Top: 10343 ft.    Interval Bottom: 16992 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/2/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/15/2019Treatment End Date:7/24/2019
Treatment Summary:Perforated Intervals: 10343'-10344'; 13942'-14074'; 16916'-16992'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10343 ft.# Of Holes:33
Interval Bottom:16992 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/6/2019                 Interval Top: 9456 ft.    Interval Bottom: 18380 ft.

 Completed Information for Formation CODELL
1st Production Date:10/2/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/15/2019Treatment End Date:7/24/2019
Treatment Summary:Perforated Intervals: 9456'-10320'; 10367'-11928'; 12034'-13919'; 14097'-16893'; 17013'-17038'; 17540'-18380'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9456 ft.# Of Holes:966
Interval Bottom:18380 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/6/2019                 Interval Top: 9011 ft.    Interval Bottom: 18598 ft.

 Completed Information for Formation CARLILE
1st Production Date:10/2/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/15/2019Treatment End Date:7/24/2019
Treatment Summary:Perforated Intervals: 9011'-9430'; 11950'-12000'; 17072'-17518'; 18404'-18598'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9011 ft.# Of Holes:136
Interval Bottom:18598 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 10/13/2019                Interval Top: 9011 ft.    Interval Bottom: 18598 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:10/2/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/15/2019Treatment End Date:7/24/2019
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 39-stage plug-and-perf; 141564 total bbls fluid pumped: 126815 bbls gelled fluid and 14749 bbls fresh water; 7312990 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):141564Max pressure during treatment (psi):8652
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10420
Fresh water used in treatment (bbls):14749Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7312990Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8843 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 163
BBLS_OIL 401
BTU_GAS 1300
CALC_BBLS_H2O 163
CALC_BBLS_OIL 401
CALC_GOR 1923
CALC_MCF_GAS 771
CASING_PRESS 2347
GRAVITY_OIL 49
MCF_GAS 771
TUBING_PRESS 1793
Perforation Data:
Interval Top:9011 ft.# Of Holes:1135
Interval Bottom:18598 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4398
Total Gas Produced (MCF)142524
GOR32406
GOR DeterminationMCFE
Average BOE per Day79.427
Average MCFE per Day460.643

 Federal Financial Assurance  i 

 Tribal Well  i No