Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20844
Well Classification: OW Status: PR - 10/13/2019
Well Name/No:Interchange B #N35-20-10N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2019
FacilityID:463342LocationID:456747
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 10 1S68W 6
Field:WATTENBERG - #90750Elevation:5213 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2513FSL  1707 FWLLat/Long: 39.979022 / -104.991093Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.979021 / -104.991092Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/8/2019
End Date: 8/17/2019
Reported: 8/28/2019
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/13/2019             Measured TD: 18912 ft.    Vertical TD: 7786 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/13/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2021
Proposed Top PZ Location:Sec:3 Twp: 1S 68W Footage: 150 FSL  694 FEL
Bottom Hole Location:Sec:34 Twp: 1N 68W Footage: 460 FNL  237 FEL
Proposed Depth/Form:18922 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 520, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18922 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2539, Top: , Bottom: 18922 ft.

Wellbore Completed
Completion Date:6/11/2019
Spud Date:3/25/2019Spud Date Is:ACTUAL
Measured TD:18912 ft.Measured PB depth:18895 ft.
True Vertical TD:7786 ft.True Vertical PB depth:7786 ft.
Top PZ Location:Sec:3 Twp: 1S 68WFootage: 195 FSL  715 FEL
Bottom Hole Location:Sec:34 Twp: 1N 68WFootage: 501 FNL  244 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20846).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1643 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1643 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18904 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2968, Top: 1963 ft., Bottom: 18912 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5267 ft.NN
SUSSEX5678 ft.NN
SHANNON6254 ft.NN
SHARON SPRINGS8669 ft.NN
NIOBRARA8724 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/13/2019                Interval Top: 9287 ft.    Interval Bottom: 18895 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/4/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/8/2019Treatment End Date:8/17/2019
Treatment Summary:Frac'd Niobrara with 48-stage plug-and-perf; 193369 total bbls fluid pumped: 172594 bbls gelled fluid and 20775 bbls fresh water; 9600140 total lbs proppant pumped: 4799965 lbs 40/70 mesh and 4800175 lbs 30/50 mesh.
Total fluid used in treatment (bbls):193369Max pressure during treatment (psi):8443
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7704
Fresh water used in treatment (bbls):20775Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9600140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9035 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 403
BBLS_OIL 316
BTU_GAS 1300
CALC_BBLS_H2O 403
CALC_BBLS_OIL 316
CALC_GOR 1769
CALC_MCF_GAS 559
CASING_PRESS 2455
GRAVITY_OIL 49
MCF_GAS 559
TUBING_PRESS 1820
Perforation Data:
Interval Top:9287 ft.# Of Holes:1129
Interval Bottom:18895 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)8174
Total Gas Produced (MCF)142731
GOR17461
GOR DeterminationMCFE
Average BOE per Day89.339
Average MCFE per Day518.187

 Federal Financial Assurance  i 

 Tribal Well  i No