|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2022 Measured TD: 24914 ft. Vertical TD: 8129 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/22/2020 | | Proposed Top PZ Location: | Sec:10 Twp: 1S 68W | Footage: 150 FNL 1020 FEL | | Bottom Hole Location: | Sec:22 Twp: 1S 68W | Footage: 460 FSL 973 FEL | | Proposed Depth/Form: | 25008 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 25008 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3425, Top: 1500 ft., Bottom: 25008 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/7/2022 | | Spud Date: | 9/13/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 24914 ft. | Measured PB depth: | 24896 ft. | | True Vertical TD: | 8129 ft. | True Vertical PB depth: | 8129 ft. | | Top PZ Location: | Sec:10 Twp: 1S 68W | Footage: 320 FNL 1004 FEL | | Bottom Hole Location: | Sec:22 Twp: 1S 68W | Footage: 461 FSL 982 FEL | | Log Types: | No logs to upload. | | Log Types: | CBL, MWD/LWD, (Resistivity on 014-20850). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1660 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 0 ft., Bottom: 1660 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24901 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3985, Top: 0 ft., Bottom: 24901 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 5109 ft. | | N | N | | SUSSEX | 5691 ft. | | N | N | | SHANNON | 6107 ft. | | N | N | | SHARON SPRINGS | 8898 ft. | | N | N | | NIOBRARA | 8934 ft. | | N | N | | FORT HAYS | 9818 ft. | | N | N | | CODELL | 10480 ft. | | | | | CARLILE | 17653 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 11/15/2022 Interval Top: 17664 ft. Interval Bottom: 17714 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 9/8/2022 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 17664 ft. | # Of Holes: | 16 | | Interval Bottom: | 17714 ft. | Hole Size: | 0.26 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/15/2022 Interval Top: 10480 ft. Interval Bottom: 24842 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/8/2022 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 6/16/2022 | Treatment End Date: | 7/4/2022 | | Treatment Summary: | Perforated Intervals: 10480'-10504'; 10810'-12763'; 13203'-13423'; 13505'-17007'; 17249'-17648'; 17729'-19831'; 19931'-24842'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 10480 ft. | # Of Holes: | 2607 | | Interval Bottom: | 24842 ft. | Hole Size: | 0.26 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 9/20/2022 Interval Top: 9830 ft. Interval Bottom: 24842 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 9/8/2022 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 6/16/2022 | Treatment End Date: | 7/4/2022 | | Treatment Summary: | Frac'd Carlile-Codell-Fort Hays with a 67 stage plug and perf;
367419 total bbls fluid pumped: 320125 bbls gelled fluid and 47294 bbls fresh water;
9484935 total lbs proppant pumped: 6638865 lbs 40/70 mesh and 2846070 lbs 30/50 mesh. | | Total fluid used in treatment (bbls): | 367419 | Max pressure during treatment (psi): | 8568 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 67 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 47294 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9484935 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9525 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/20/2022 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 74 | | BBLS_OIL | 246 | | BTU_GAS | 1340 | | CALC_BBLS_H2O | 74 | | CALC_BBLS_OIL | 246 | | CALC_GOR | 1793 | | CALC_MCF_GAS | 441 | | CASING_PRESS | 2799 | | GRAVITY_OIL | 50 | | MCF_GAS | 441 | | TUBING_PRESS | 2397 |
| | Perforation Data: | | Interval Top: | 9830 ft. | # Of Holes: | 2948 | | Interval Bottom: | 24842 ft. | Hole Size: | 0.26 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/15/2022 Interval Top: 9830 ft. Interval Bottom: 19922 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 9/8/2022 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 6/16/2022 | Treatment End Date: | 7/4/2022 | | Treatment Summary: | Perforated Intervals: 9830'-10456'; 10505'-10786'; 12764'-13183'; 13443'-13483'; 17029'-17235', 19849'-19922'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9830 ft. | # Of Holes: | 325 | | Interval Bottom: | 19922 ft. | Hole Size: | 0.26 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 35770 |
| Total Gas Produced (MCF) | 495146 |
| GOR | 13842 |
| GOR Determination | BOE |
| Average BOE per Day | 332.027 |
| Average MCFE per Day | 1925.771 |
| Federal Financial Assurance | i | |
|
|