Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20778
Well Classification: OW Status: PR - 11/1/2022
Well Name/No:INTERCHANGE B #S22-30-19C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2022
FacilityID:456758LocationID:456747
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 10 1S68W 6
Field:WATTENBERG - #90750Elevation:5206 ft.
Planned Location:2218FSL  1758 FWLLat/Long: 39.978209 / -104.990908Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978205 / -104.990903Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2022
End Date: 7/2/2022
Reported: 7/13/2022
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2022             Measured TD: 25107 ft.    Vertical TD: 8129 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/22/2020
Prop Depth/Form:25236 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 25236 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3459, Top: 1500 ft., Bottom: 25236 ft.

Wellbore Completed
Completion Date:5/27/2022
Spud Date:9/15/2019Spud Date Is:ACTUAL
Measured TD:25107 ft.Measured PB depth:25090 ft.
True Vertical TD:8129 ft.True Vertical PB depth:8129 ft.
Top PZ Location:Sec:10 Twp: 1S 68WFootage: 229 FNL  224 FELDepth
Bottom Hole Location:Sec:22 Twp: 1S 68WFootage: 460 FSL  198 FELDepth
Log Types:No logs to upload.
Log Types:CBL, MWD/LWD, (Resistivity on 014-20850).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1671 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1671 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 25095 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 4025, Top: 1585 ft., Bottom: 25095 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5223 ft.NN
SUSSEX5818 ft.NN
SHANNON6250 ft.NN
SHARON SPRINGS9079 ft.NN
NIOBRARA9127 ft.NN
FORT HAYS9903 ft.NN
CODELL10266 ft.NN
CARLILE12246 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/15/2022                Interval Top: 12246 ft.    Interval Bottom: 15201 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/8/2022Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Perforated Intervals: 12246'-12331'; 14327'-14383'; 14464'-14868'; 14923'-15201'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12246 ft.# Of Holes:162
Interval Bottom:15201 ft.Hole Size:0.26 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/15/2022                Interval Top: 10266 ft.    Interval Bottom: 25038 ft.

 Completed Information for Formation CODELL
1st Production Date:9/8/2022Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Perforated Intervals: 10266'-11029'; 11273'-12245'; 12347'-14309'; 14400'-14455'; 14886'-14906'; 15223'-16394'; 17028'-17504'; 17787'-25038'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10266 ft.# Of Holes:2230
Interval Bottom:25038 ft.Hole Size:0.26 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/20/2022                 Interval Top: 9920 ft.    Interval Bottom: 25038 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/8/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 60 stage plug and perf; 357620 total bbls fluid pumped: 321851 bbls gelled fluid and 35769 bbls fresh water; 9517220 total lbs proppant pumped: 6655180 lbs 40/70 mesh and 2862040 lbs 30/50 mesh.
Total fluid used in treatment (bbls):357620Max pressure during treatment (psi):8590
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):35769Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9517220Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9846 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/20/2022Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BBLS_OIL 292
BTU_GAS 1340
CALC_BBLS_H2O 50
CALC_BBLS_OIL 292
CALC_GOR 1651
CALC_MCF_GAS 482
CASING_PRESS 2875
GRAVITY_OIL 50
MCF_GAS 482
TUBING_PRESS 2521
Perforation Data:
Interval Top:9920 ft.# Of Holes:2640
Interval Bottom:25038 ft.Hole Size:0.26 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/15/2022                Interval Top: 9920 ft.    Interval Bottom: 17763 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/8/2022Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Perforated Intervals: 9920'-10245'; 11046'-11253'; 16416'-17011'; 17531'-17763'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9920 ft.# Of Holes:248
Interval Bottom:17763 ft.Hole Size:0.26 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)115923
Total Gas Produced (MCF)676958
GOR5839
GOR DeterminationBOE
Average BOE per Day636.100
Average MCFE per Day3689.381

 Federal Financial Assurance  i 

 Tribal Well  i No