Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20772
Well Classification: OW Status: PR - 10/13/2019
Well Name/No:Interchange B #N35-20-5C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2019
FacilityID:456752LocationID:456747
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 10 1S68W 6
Field:WATTENBERG - #90750Elevation:5213 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2492FSL  1620 FWLLat/Long: 39.978964 / -104.991406Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978965 / -104.991404Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2019
End Date: 8/3/2019
Reported: 8/15/2019
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/13/2019             Measured TD: 18720 ft.    Vertical TD: 8037 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/13/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/22/2020
Proposed Top PZ Location:Sec:3 Twp: 1S 68W Footage: 192 FSL  2021 FEL
Bottom Hole Location:Sec:34 Twp: 1N 68W Footage: 510 FNL  1550 FEL
Proposed Depth/Form:18787 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 640, Drill Unit: E2 S.3, E2 S.34
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18787 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2519, Top: 1500 ft., Bottom: 18787 ft.

Wellbore Completed
Completion Date:5/15/2019
Spud Date:4/1/2019Spud Date Is:ACTUAL
Measured TD:18720 ft.Measured PB depth:18700 ft.
True Vertical TD:8037 ft.True Vertical PB depth:8038 ft.
Top PZ Location:Sec:3 Twp: 1S 68WFootage: 192 FSL  2021 FEL
Bottom Hole Location:Sec:34 Twp: 1N 68WFootage: 510 FNL  1550 FEL
Log Types:CBL, Mud, MWD/LWD, (Resistivity on 014-20846).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1646 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1646 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18705 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2328, Top: 530 ft., Bottom: 18720 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4958 ft.NN
SUSSEX5371 ft.NN
SHANNON5910 ft.NN
SHARON SPRINGS8274 ft.NN
NIOBRARA8323 ft.NN
FORT HAYS8958 ft.NN
CODELL9498 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/7/2019                 Interval Top: 9509 ft.    Interval Bottom: 18696 ft.

 Completed Information for Formation CODELL
1st Production Date:10/3/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2019Treatment End Date:8/3/2019
Treatment Summary:Perforated Intervals: 9509'-14319'; 14593'-18696'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9509 ft.# Of Holes:1063
Interval Bottom:18696 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 10/13/2019                Interval Top: 9113 ft.    Interval Bottom: 18696 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:10/3/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2019Treatment End Date:8/3/2019
Treatment Summary:Frac'd Codell-Fort Hays with 39-stage plug-and-perf; 140329 total bbls fluid pumped: 126881 bbls gelled fluid and 13448 bbls fresh water; 7312605 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):140329Max pressure during treatment (psi):8523
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10184
Fresh water used in treatment (bbls):13448Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7312605Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8914 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 136
BBLS_OIL 471
BTU_GAS 1300
CALC_BBLS_H2O 136
CALC_BBLS_OIL 471
CALC_GOR 2108
CALC_MCF_GAS 993
CASING_PRESS 1647
GRAVITY_OIL 49
MCF_GAS 993
TUBING_PRESS 2105
Perforation Data:
Interval Top:9113 ft.# Of Holes:1141
Interval Bottom:18696 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/7/2019                 Interval Top: 9113 ft.    Interval Bottom: 14570 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/3/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2019Treatment End Date:8/3/2019
Treatment Summary:Perforated Intervals: 9113'-9486'; 14342'-14570'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9113 ft.# Of Holes:78
Interval Bottom:14570 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4879
Total Gas Produced (MCF)117147
GOR24010
GOR DeterminationMCFE
Average BOE per Day68.786
Average MCFE per Day398.973

 Federal Financial Assurance  i 

 Tribal Well  i No