Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20768
Well Classification: OW Status: PR - 9/5/2022
Well Name/No:INTERCHANGE A #S22-30-7C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/5/2022
FacilityID:456745LocationID:456747
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:SWNW 10 1S68W 6
Field:WATTENBERG - #90750Elevation:5231 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2310FNL  1138 FWLLat/Long: 39.980305 / -104.993130Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.980305 / -104.993128Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/15/2022
End Date: 5/26/2022
Reported: 7/8/2022
Originally Reported: 6/23/2022
Days to report: 43
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/5/2022             Measured TD: 24236 ft.    Vertical TD: 8142 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/5/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/22/2020
Proposed Top PZ Location:Sec:10 Twp: 1S 68W Footage: 150 FNL  1930 FWL
Bottom Hole Location:Sec:22 Twp: 1S 68W Footage: 460 FSL  1934 FWL
Proposed Depth/Form:24223 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24223 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3311, Top: 1500 ft., Bottom: 24223 ft.

Wellbore Completed
Completion Date:3/20/2022
Spud Date:9/23/2019Spud Date Is:ACTUAL
Measured TD:24236 ft.Measured PB depth:24220 ft.
True Vertical TD:8142 ft.True Vertical PB depth:8142 ft.
Top PZ Location:Sec:10 Twp: 1S 68WFootage: 457 FNL  1849 FWL
Bottom Hole Location:Sec:22 Twp: 1S 68WFootage: 462 FSL  1878 FWL
Log Types:No logs to upload.
Log Types:CBL, MWD/LWD, (Resistivity on 014-20850).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1629 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1629 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24220 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3807, Top: 1386 ft., Bottom: 24220 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4906 ft.NN
SUSSEX5436 ft.NN
SHANNON5809 ft.NN
SHARON SPRINGS8282 ft.NN
NIOBRARA8320 ft.NN
FORT HAYS9070 ft.NN
CODELL9273 ft.NN
CARLILE12020 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/9/2022                 Interval Top: 12035 ft.    Interval Bottom: 18028 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/25/2022Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/15/2022Treatment End Date:5/26/2022
Treatment Summary:Perforated Intervals: 12035'-13555'; 17390'-18028'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12035 ft.# Of Holes:375
Interval Bottom:18028 ft.Hole Size:0.26 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/9/2022                 Interval Top: 10828 ft.    Interval Bottom: 19322 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/25/2022Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/15/2022Treatment End Date:5/26/2022
Treatment Summary:Perforated Intervals: 10828'-10978'; 11572'-11640'; 14766'-14791'; 16865'-16926'; 17346'-17369'; 19237'-19322'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10828 ft.# Of Holes:92
Interval Bottom:19322 ft.Hole Size:0.26 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/5/2022                  Interval Top: 9287 ft.    Interval Bottom: 24181 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/25/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/15/2022Treatment End Date:5/26/2022
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 60 stage plug and perf; 360250 total bbls fluid pumped: 325363 bbls gelled fluid and 34887 bbls fresh water; 9383520 total lbs proppant pumped: 6549785 lbs 40/70 mesh and 2833735 lbs 30/50 mesh.
Total fluid used in treatment (bbls):360250Max pressure during treatment (psi):8569
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):34887Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9383520Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9015 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 104
BBLS_OIL 316
BTU_GAS 1340
CALC_BBLS_H2O 104
CALC_BBLS_OIL 316
CALC_GOR 1706
CALC_MCF_GAS 539
CASING_PRESS 3085
GRAVITY_OIL 50
MCF_GAS 539
TUBING_PRESS 2731
Perforation Data:
Interval Top:9287 ft.# Of Holes:2640
Interval Bottom:24181 ft.Hole Size:0.26 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/9/2022                 Interval Top: 9287 ft.    Interval Bottom: 24181 ft.

 Completed Information for Formation CODELL
1st Production Date:8/25/2022Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/15/2022Treatment End Date:5/26/2022
Treatment Summary:Perforated Intervals: 9287'-10807'; 10998'-11556'; 11655'-12014'; 13577'-14743'; 14812'-16864'; 16944'-17325'; 18052'-19217'; 19342'-24181'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9287 ft.# Of Holes:2173
Interval Bottom:24181 ft.Hole Size:0.26 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)31131
Total Gas Produced (MCF)472842
GOR15188
GOR DeterminationMCFE
Average BOE per Day308.843
Average MCFE per Day1791.301

 Federal Financial Assurance  i 

 Tribal Well  i No