|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/5/2022 Measured TD: 24315 ft. Vertical TD: 8179 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/5/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/22/2020 | | Proposed Top PZ Location: | Sec:10 Twp: 1S 68W | Footage: 150 FNL 2580 FEL | | Bottom Hole Location: | Sec:22 Twp: 1S 68W | Footage: 460 FSL 2532 FEL | | Proposed Depth/Form: | 24304 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24304 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3323, Top: 1500 ft., Bottom: 24304 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/17/2022 | | Spud Date: | 9/24/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 24315 ft. | Measured PB depth: | 24305 ft. | | True Vertical TD: | 8179 ft. | True Vertical PB depth: | 8179 ft. | | Top PZ Location: | Sec:10 Twp: 1S 68W | Footage: 419 FNL 2521 FEL | | Bottom Hole Location: | Sec:22 Twp: 1S 68W | Footage: 463 FSL 2468 FEL | | Log Types: | No logs to upload. | | Log Types: | CBL, MWD/LWD, (Resistivity on 014-20850). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1641 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1641 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24310 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3890, Top: 1470 ft., Bottom: 24310 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4959 ft. | | N | N | | SUSSEX | 5372 ft. | | N | N | | SHANNON | 5756 ft. | | N | N | | SHARON SPRINGS | 8315 ft. | | N | N | | NIOBRARA | 8355 ft. | | N | N | | FORT HAYS | 9171 ft. | | N | N | | CODELL | 9306 ft. | | N | N | | CARLILE | 15360 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 11/11/2022 Interval Top: 15366 ft. Interval Bottom: 15735 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 8/25/2022 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 15366 ft. | # Of Holes: | 72 | | Interval Bottom: | 15735 ft. | Hole Size: | 0.26 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/11/2022 Interval Top: 9785 ft. Interval Bottom: 23768 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 8/25/2022 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/29/2022 | Treatment End Date: | 6/11/2022 | | Treatment Summary: | Perforated Intervals: 9785'-9800'; 10280'-10815'; 11816'-12152'; 12281'-12534'; 18364'-18459'; 19007'-19370'; 23426'-23768'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9785 ft. | # Of Holes: | 392 | | Interval Bottom: | 23768 ft. | Hole Size: | 0.26 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 9/5/2022 Interval Top: 9314 ft. Interval Bottom: 24271 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 8/25/2022 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/29/2022 | Treatment End Date: | 6/11/2022 | | Treatment Summary: | Frac'd Carlile-Codell-Fort Hays with a 67 stage plug and perf;
360119 total bbls fluid pumped: 318773 bbls gelled fluid and 41346 bbls fresh water;
9438075 total lbs proppant pumped: 6579495 lbs 40/70 mesh and 2858580 lbs 30/50 mesh. | | Total fluid used in treatment (bbls): | 360119 | Max pressure during treatment (psi): | 8436 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 67 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 41346 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9438075 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9118 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2022 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 92 | | BBLS_OIL | 327 | | BTU_GAS | 1340 | | CALC_BBLS_H2O | 92 | | CALC_BBLS_OIL | 327 | | CALC_GOR | 1654 | | CALC_MCF_GAS | 541 | | CASING_PRESS | 3109 | | GRAVITY_OIL | 50 | | MCF_GAS | 541 | | TUBING_PRESS | 2757 |
| | Perforation Data: | | Interval Top: | 9314 ft. | # Of Holes: | 2948 | | Interval Bottom: | 24271 ft. | Hole Size: | 0.26 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/11/2022 Interval Top: 9314 ft. Interval Bottom: 24271 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/25/2022 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/29/2022 | Treatment End Date: | 6/11/2022 | | Treatment Summary: | Perforated Intervals: 9314'-9771'; 9813'-10253'; 10839'-11798'; 12172'-12254'; 12555'-15354'; 15752'-18346'; 18476'-18998'; 19391'-23410'; 23777'-24271'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 9314 ft. | # Of Holes: | 2484 | | Interval Bottom: | 24271 ft. | Hole Size: | 0.26 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 42596 |
| Total Gas Produced (MCF) | 552340 |
| GOR | 12966 |
| GOR Determination | BOE |
| Average BOE per Day | 377.489 |
| Average MCFE per Day | 2189.470 |
| Federal Financial Assurance | i | |
|
|