Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20756
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-4N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455314LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5318 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2332FSL  1474 FELLat/Long: 39.978563 / -105.039929Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978563 / -105.039929Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2019
End Date: 1/8/2020
Reported: 1/13/2020
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21250 ft.    Vertical TD: 8110 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Proposed Top PZ Location:Sec:7 Twp: 1S 68W Footage: 2461 FSL  1333 FWL
Bottom Hole Location:Sec:19 Twp: 1S 68W Footage: 460 FSL  1301 FWL
Proposed Depth/Form:21363 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21363 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2894, Top: 1500 ft., Bottom: 21363 ft.

Wellbore Completed
Completion Date:7/10/2019
Spud Date:6/6/2019Spud Date Is:ACTUAL
Measured TD:21250 ft.Measured PB depth:21240 ft.
True Vertical TD:8110 ft.True Vertical PB depth:8110 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2424 FSL  1348 FWL
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 510 FSL  1305 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1626 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 1628 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21245 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3437, Top: 290 ft., Bottom: 21250 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4901 ft.NN
SUSSEX5295 ft.NN
SHANNON5806 ft.NN
SHARON SPRINGS8460 ft.NN
NIOBRARA8496 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8780 ft.    Interval Bottom: 21231 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/19/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/8/2020
Treatment Summary:62-stage plug-and-perf completion; 306239 total bbls fluid pumped: 275862 bbls gelled fluid and 30377 bbls fresh water (no acid). 12400135 total lbs proppant pumped: all 40/70 mesh.
Total fluid used in treatment (bbls):306239Max pressure during treatment (psi):8373
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:62
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):21069
Fresh water used in treatment (bbls):30377Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12400135Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 500
BBLS_OIL 680
BTU_GAS 1390
CALC_BBLS_H2O 500
CALC_BBLS_OIL 680
CALC_GOR 2018
CALC_MCF_GAS 1372
CASING_PRESS 2735
GRAVITY_OIL 52
MCF_GAS 1372
TUBING_PRESS 2195
Perforation Data:
Interval Top:8780 ft.# Of Holes:1465
Interval Bottom:21231 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)8945
Total Gas Produced (MCF)197324
GOR22059
GOR DeterminationMCFE
Average BOE per Day117.779
Average MCFE per Day683.110

 Federal Financial Assurance  i 

 Tribal Well  i No