Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20755
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-5C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455313LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5319 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2332FSL  1456 FELLat/Long: 39.978563 / -105.039865Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978564 / -105.039865Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2019
End Date: 1/6/2020
Reported: 1/13/2020
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21457 ft.    Vertical TD: 8364 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Proposed Top PZ Location:Sec:7 Twp: 1S 68W Footage: 2455 FSL  1664 FWL
Bottom Hole Location:Sec:19 Twp: 1S 68W Footage: 460 FSL  1631 FWL
Proposed Depth/Form:21489 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21489 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2913, Top: 1500 ft., Bottom: 21489 ft.

Wellbore Completed
Completion Date:8/4/2019
Spud Date:6/6/2019Spud Date Is:ACTUAL
Measured TD:21457 ft.Measured PB depth:21454 ft.
True Vertical TD:8364 ft.True Vertical PB depth:8364 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2409 FSL  1652 FWL
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 498 FSL  1641 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1615 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1617 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21454 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3621, Top: 3442 ft., Bottom: 21457 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4802 ft.NN
SUSSEX5207 ft.NN
SHANNON5730 ft.NN
SHARON SPRINGS8216 ft.NN
NIOBRARA8235 ft.NN
FORT HAYS8827 ft.NN
CODELL8933 ft.NN
CARLILE15068 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 15083 ft.    Interval Bottom: 15256 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/18/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Interval: 15083'-15256'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15083 ft.# Of Holes:24
Interval Bottom:15256 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 10818 ft.    Interval Bottom: 10964 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2020Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Interval: 10818'-10964'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10818 ft.# Of Holes:21
Interval Bottom:10964 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/18/2020                 Interval Top: 9699 ft.    Interval Bottom: 20158 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/18/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Intervals: 9699'-9974'; 10797'-10798'; 10988'-11073'; 15617'-15761'; 16775'-17073'; 20052'-20158'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9699 ft.# Of Holes:126
Interval Bottom:20158 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 8993 ft.    Interval Bottom: 21231 ft.

 Completed Information for Formation CODELL
1st Production Date:4/18/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Intervals: 8993'-9672'; 10008'-10770'; 11096'-15045'; 15278'-15591'; 15781'-16751'; 17112'-20025'; 20184'-21231'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8993 ft.# Of Holes:1300
Interval Bottom:21231 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8993 ft.    Interval Bottom: 21231 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/18/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with a 50-stage plug-and-perf; 193672 total bbls fluid pumped: 169163 bbls gelled fluid and 24509 bbls fresh water (no acid); 9271570 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):193672Max pressure during treatment (psi):8641
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16755
Fresh water used in treatment (bbls):24509Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9271570Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8966 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 196
BBLS_OIL 689
BTU_GAS 1390
CALC_BBLS_H2O 196
CALC_BBLS_OIL 689
CALC_GOR 2772
CALC_MCF_GAS 1910
CASING_PRESS 3050
GRAVITY_OIL 52
MCF_GAS 1910
TUBING_PRESS 2803
Perforation Data:
Interval Top:8993 ft.# Of Holes:1471
Interval Bottom:21231 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)18745
Total Gas Produced (MCF)159265
GOR8496
GOR DeterminationBOE
Average BOE per Day126.595
Average MCFE per Day734.248

 Federal Financial Assurance  i 

 Tribal Well  i No