Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20755
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-5C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455313LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5319 ft.
Planned Location:2332FSL  1456 FELLat/Long: 39.978563 / -105.039865Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978564 / -105.039865Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2019
End Date: 1/6/2020
Reported: 1/13/2020
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21457 ft.    Vertical TD: 8364 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Prop Depth/Form:21489 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21489 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2913, Top: 1500 ft., Bottom: 21489 ft.

Wellbore Completed
Completion Date:8/4/2019
Spud Date:6/6/2019Spud Date Is:ACTUAL
Measured TD:21457 ft.Measured PB depth:21454 ft.
True Vertical TD:8364 ft.True Vertical PB depth:8364 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2409 FSL  1652 FWLDepth
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 498 FSL  1641 FWLDepth
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1615 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1617 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21454 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3621, Top: 3442 ft., Bottom: 21457 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4802 ft.NN
SUSSEX5207 ft.NN
SHANNON5730 ft.NN
SHARON SPRINGS8216 ft.NN
NIOBRARA8235 ft.NN
FORT HAYS8827 ft.NN
CODELL8933 ft.NN
CARLILE15068 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 15083 ft.    Interval Bottom: 15256 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/18/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Interval: 15083'-15256'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15083 ft.# Of Holes:24
Interval Bottom:15256 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 10818 ft.    Interval Bottom: 10964 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2020Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Interval: 10818'-10964'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10818 ft.# Of Holes:21
Interval Bottom:10964 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/18/2020                 Interval Top: 9699 ft.    Interval Bottom: 20158 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/18/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Intervals: 9699'-9974'; 10797'-10798'; 10988'-11073'; 15617'-15761'; 16775'-17073'; 20052'-20158'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9699 ft.# Of Holes:126
Interval Bottom:20158 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 8993 ft.    Interval Bottom: 21231 ft.

 Completed Information for Formation CODELL
1st Production Date:4/18/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Perforated Intervals: 8993'-9672'; 10008'-10770'; 11096'-15045'; 15278'-15591'; 15781'-16751'; 17112'-20025'; 20184'-21231'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8993 ft.# Of Holes:1300
Interval Bottom:21231 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8993 ft.    Interval Bottom: 21231 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/18/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2019Treatment End Date:1/6/2020
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with a 50-stage plug-and-perf; 193672 total bbls fluid pumped: 169163 bbls gelled fluid and 24509 bbls fresh water (no acid); 9271570 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):193672Max pressure during treatment (psi):8641
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16755
Fresh water used in treatment (bbls):24509Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9271570Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8966 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 196
BBLS_OIL 689
BTU_GAS 1390
CALC_BBLS_H2O 196
CALC_BBLS_OIL 689
CALC_GOR 2772
CALC_MCF_GAS 1910
CASING_PRESS 3050
GRAVITY_OIL 52
MCF_GAS 1910
TUBING_PRESS 2803
Perforation Data:
Interval Top:8993 ft.# Of Holes:1471
Interval Bottom:21231 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)28898
Total Gas Produced (MCF)192100
GOR6647
GOR DeterminationBOE
Average BOE per Day169.439
Average MCFE per Day982.777

 Federal Financial Assurance  i 

 Tribal Well  i No