Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20754
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-8C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455312LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5321 ft.
Planned Location:2331FSL  1402 FELLat/Long: 39.978562 / -105.039672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978563 / -105.039673Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/3/2019
End Date: 12/18/2019
Reported: 1/13/2020
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21183 ft.    Vertical TD: 8409 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Prop Depth/Form:21271 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21271 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2881, Top: 1500 ft., Bottom: 21271 ft.

Wellbore Completed
Completion Date:8/28/2019
Spud Date:6/8/2019Spud Date Is:ACTUAL
Measured TD:21183 ft.Measured PB depth:21158 ft.
True Vertical TD:8409 ft.True Vertical PB depth:8408 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2385 FSL  2456 FELDepth
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 509 FSL  2542 FELDepth
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1622 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21173 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3586, Top: 2750 ft., Bottom: 21183 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4690 ft.NN
SUSSEX5065 ft.NN
SHANNON5590 ft.NN
NIOBRARA7982 ft.NN
FORT HAYS8629 ft.NN
CODELL8702 ft.NN
CARLILE10258 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 10265 ft.    Interval Bottom: 14814 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/17/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Intervals: 10265'-10328'; 14392'-14814'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10265 ft.# Of Holes:60
Interval Bottom:14814 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/18/2020                 Interval Top: 9419 ft.    Interval Bottom: 21146 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/17/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Intervals: 9419'-9788'; 13495'-13779'; 16451'-16615'; 18726'-18777'; 19405'-19451'; 19500'-19546'; 20764'-21146'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9419 ft.# Of Holes:172
Interval Bottom:21146 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 9370 ft.    Interval Bottom: 9395 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/17/2020Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Interval: 9370'-9395'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9370 ft.# Of Holes:6
Interval Bottom:9395 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 8756 ft.    Interval Bottom: 20740 ft.

 Completed Information for Formation CODELL
1st Production Date:4/17/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Intervals: 8756'-9346'; 9812'-10243'; 10352'-13472'; 13803'-14369'; 14834'-16431'; 16639'-18702'; 18811'-19377'; 19475'-19476'; 19585'-20740'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8756 ft.# Of Holes:1203
Interval Bottom:20740 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8756 ft.    Interval Bottom: 21146 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/17/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with a 49-stage plug-and-perf; 183862 total bbls fluid pumped: 165146 bbls gelled fluid and 18716 bbls fresh water (no acid); 9187895 total lbs proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):183862Max pressure during treatment (psi):8413
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):17059
Fresh water used in treatment (bbls):18716Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9187895Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8723 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 326
BBLS_OIL 583
BTU_GAS 1390
CALC_BBLS_H2O 326
CALC_BBLS_OIL 583
CALC_GOR 2717
CALC_MCF_GAS 1584
CASING_PRESS 3040
GRAVITY_OIL 52
MCF_GAS 1584
TUBING_PRESS 2641
Perforation Data:
Interval Top:8756 ft.# Of Holes:1441
Interval Bottom:21146 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)25362
Total Gas Produced (MCF)193514
GOR7630
GOR DeterminationBOE
Average BOE per Day160.522
Average MCFE per Day931.036

 Federal Financial Assurance  i 

 Tribal Well  i No