|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2024 Measured TD: 8545 ft. Vertical TD: 8438 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/11/2013 | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 1325 FNL 50 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 1325 FNL 50 FEL | Proposed Depth/Form: | 8539 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 397, Top: 0 ft., Bottom: 1090 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8539 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 191, Top: 7353 ft., Bottom: 8539 ft. | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5179 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 83, Top: 4579 ft., Bottom: 5179 ft. |
| | |
Wellbore Completed | Completion Date: | 1/2/2012 | Spud Date: | 12/27/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8545 ft. | Measured PB depth: | 8480 ft. | True Vertical TD: | 8438 ft. | True Vertical PB depth: | 8372 ft. | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 1325 FNL 50 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 1325 FNL 50 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 1095 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 0 ft., Bottom: 1095 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8525 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 4105 ft., Bottom: 8525 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4775 ft. | | | | NIOBRARA | 7562 ft. | | | | CODELL | 7960 ft. | | | | J SAND | 8400 ft. | | | |
Formation JSND Formation Classification: Status: SI - 9/1/2024 Interval Top: 8412 ft. Interval Bottom: 8437 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/1/2012 | Treatment Summary: | Frac'd the J-Sand 8412’-8437’, (50 holes)w/ 61,656 gal 18 # pHaser Hybrid cross
linked gel containing 250,080 # 20/40 Sand. 03-01-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8412 ft. | # Of Holes: | 50 | Interval Bottom: | 8437 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 6/26/2012 Interval Top: 7960 ft. Interval Bottom: 7980 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/3/2012 | Treatment Summary: | Set CFP @ 8020'. 03-02-12
Frac'd the Codell 7,960’ – 7,980’ (40 holes) w/ 73,710 gal 22# pHaser Hybrid cross
linked gel containing 100,160 # 30/50 sand. 03-03-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7960 ft. | # Of Holes: | 40 | Interval Bottom: | 7980 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 6/26/2012 Interval Top: 7632 ft. Interval Bottom: 7735 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | Set CFP @ 7775'. 03-03-12
Frac'd the Niobrara 7,632’ – 7,735’ (112 holes), w/ 81,480 gals 18 # pHaser Hybrid cross
linked gel containing 99,520 # 30/50 sand. 03-05-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7632 ft. | # Of Holes: | 112 | Interval Bottom: | 7735 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/17/2012 Interval Top: 7562 ft. Interval Bottom: 8437 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/17/2012 | Treatment Summary: | Set CBP @ 7520'. 04-05-12
Drilled out CBP @ 7520', CFP's @ 7775', CFP @ 8020' to commingle the JSND-NBRR-CDL. 04-06-12
|
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8390 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/17/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 35 | BBLS_OIL | 75 | BTU_GAS | 1308 | CALC_BBLS_H2O | 35 | CALC_BBLS_OIL | 75 | CALC_GOR | 4507 | CALC_MCF_GAS | 338 | CASING_PRESS | 1381 | GRAVITY_OIL | 49 | MCF_GAS | 338 | TUBING_PRESS | 629 |
| Perforation Data: | Interval Top: | 7562 ft. | # Of Holes: | 202 | Interval Bottom: | 8437 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: SI - 9/1/2024 Interval Top: 7562 ft. Interval Bottom: 7980 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7562 ft. | # Of Holes: | 152 | Interval Bottom: | 7980 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 02/2024 - 01/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 27 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.014 |
Average MCFE per Day | 0.074 |
Federal Financial Assurance | i | |
|
|