|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/10/2023 Measured TD: 8585 ft. Vertical TD: 8459 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/10/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/11/2013 | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 77 FNL 1472 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 77 FNL 1472 FEL | Proposed Depth/Form: | 8554 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 397, Top: 0 ft., Bottom: 1090 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8554 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 189, Top: 7379 ft., Bottom: 8554 ft. | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5169 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 83, Top: 4569 ft., Bottom: 5169 ft. |
| | |
Wellbore Completed | Completion Date: | 1/9/2012 | Spud Date: | 1/2/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8585 ft. | Measured PB depth: | 8504 ft. | True Vertical TD: | 8459 ft. | True Vertical PB depth: | 8378 ft. | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 77 FNL 1472 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 77 FNL 1472 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1121 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 443, Top: 0 ft., Bottom: 1121 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8569 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 3626 ft., Bottom: 8569 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4807 ft. | | | | NIOBRARA | 7602 ft. | | | | CODELL | 7989 ft. | | | | J SAND | 8433 ft. | | | |
Formation JSND Formation Classification: Status: AB - 11/10/2023 Interval Top: 8441 ft. Interval Bottom: 8466 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/6/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/1/2012 | Treatment Summary: | Frac'd the J-Sand 8441’-8466’, (50 holes)w/ 68,250 gal 18 # pHaser Hybrid cross
linked gel containing 250,080 # 20/40 Sand. 03-01-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8441 ft. | # Of Holes: | 50 | Interval Bottom: | 8466 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 8/13/2012 Interval Top: 7989 ft. Interval Bottom: 8009 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | Set CFP @ 8060'. 03-02-12
Frac'd the Codell 7,989’ – 8,009’ (40 holes) w/ 61,886 gal 22# pHaser Hybrid cross
linked gel containing 152,560 # 30/50 sand. 03-05-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7989 ft. | # Of Holes: | 40 | Interval Bottom: | 8009 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/20/2012 Interval Top: 7602 ft. Interval Bottom: 8466 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/20/2012 | Treatment Summary: | Set CBP @ 7570'. 04-03-12
Drilled out CBP @ 7570', CFP @ 7810', CFP @ 8060' to commingle the JSND-NBRR-CDL. 04-04-12 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8420 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/20/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 25 | BBLS_OIL | 48 | BTU_GAS | 1308 | CALC_BBLS_H2O | 25 | CALC_BBLS_OIL | 48 | CALC_GOR | 5688 | CALC_MCF_GAS | 273 | CASING_PRESS | 1309 | GRAVITY_OIL | 49 | MCF_GAS | 273 | TUBING_PRESS | 561 |
| Perforation Data: | Interval Top: | 7602 ft. | # Of Holes: | 218 | Interval Bottom: | 8466 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 11/10/2023 Interval Top: 7602 ft. Interval Bottom: 8009 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/6/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7602 ft. | # Of Holes: | 168 | Interval Bottom: | 8009 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 8/13/2012 Interval Top: 7602 ft. Interval Bottom: 7770 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | Set CFP @ 7810'. 03-05-12
Frac'd the Niobrara 7,602’ – 7,770’ (128 holes), w/ 63,840 gals 18 # pHaser Hybrid cross
linked gel containing 149,800 # 30/50 sand. 03-05-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7602 ft. | # Of Holes: | 128 | Interval Bottom: | 7770 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 11/10/2023 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|