Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20712
Well Classification: GW Status: PA - 11/10/2023
Well Name/No:BURY CRANDELL #6-0-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/10/2023
FacilityID:423158LocationID:321535
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NENE 23 1N68W 6
Field:WATTENBERG - #90750Elevation:5112 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1041FNL  1011 FELLat/Long: 40.041320 / -104.964820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041325 / -104.964837Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/1/2012
End Date: 3/1/2012
Reported: 5/2/2012
Prior to rule 205A.b.(2)(A)
Days to report: 62
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/10/2023             Measured TD: 8585 ft.    Vertical TD: 8459 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/10/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/11/2013
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 77 FNL  1472 FEL
Bottom Hole Location:Sec:23 Twp: 1N 68W Footage: 77 FNL  1472 FEL
Proposed Depth/Form:8554 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 397, Top: 0 ft., Bottom: 1090 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8554 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 189, Top: 7379 ft., Bottom: 8554 ft.
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5169 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4569 ft., Bottom: 5169 ft.

Wellbore Completed
Completion Date:1/9/2012
Spud Date:1/2/2012Spud Date Is:ACTUAL
Measured TD:8585 ft.Measured PB depth:8504 ft.
True Vertical TD:8459 ft.True Vertical PB depth:8378 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 77 FNL  1472 FEL
Bottom Hole Location:Sec:23 Twp: 1N 68WFootage: 77 FNL  1472 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1121 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 443, Top: 0 ft., Bottom: 1121 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8569 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 3626 ft., Bottom: 8569 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4807 ft.
NIOBRARA7602 ft.
CODELL7989 ft.
J SAND8433 ft.

Formation JSND                     Formation Classification:                       Status:  AB - 11/10/2023                Interval Top: 8441 ft.    Interval Bottom: 8466 ft.

 Completed Information for Formation J SAND
1st Production Date:4/6/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/1/2012
Treatment Summary:Frac'd the J-Sand 8441’-8466’, (50 holes)w/ 68,250 gal 18 # pHaser Hybrid cross linked gel containing 250,080 # 20/40 Sand. 03-01-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8441 ft.# Of Holes:50
Interval Bottom:8466 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:                       Status:  CM - 8/13/2012                 Interval Top: 7989 ft.    Interval Bottom: 8009 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/5/2012
Treatment Summary:Set CFP @ 8060'. 03-02-12 Frac'd the Codell 7,989’ – 8,009’ (40 holes) w/ 61,886 gal 22# pHaser Hybrid cross linked gel containing 152,560 # 30/50 sand. 03-05-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7989 ft.# Of Holes:40
Interval Bottom:8009 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:                     Status:  CM - 4/20/2012                 Interval Top: 7602 ft.    Interval Bottom: 8466 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/20/2012
Treatment Summary:Set CBP @ 7570'. 04-03-12 Drilled out CBP @ 7570', CFP @ 7810', CFP @ 8060' to commingle the JSND-NBRR-CDL. 04-04-12
Tubing Size:2.375 in.Tubing Setting Depth:8420 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 48
BTU_GAS 1308
CALC_BBLS_H2O 25
CALC_BBLS_OIL 48
CALC_GOR 5688
CALC_MCF_GAS 273
CASING_PRESS 1309
GRAVITY_OIL 49
MCF_GAS 273
TUBING_PRESS 561
Perforation Data:
Interval Top:7602 ft.# Of Holes:218
Interval Bottom:8466 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:                     Status:  AB - 11/10/2023                Interval Top: 7602 ft.    Interval Bottom: 8009 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/6/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7602 ft.# Of Holes:168
Interval Bottom:8009 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:                       Status:  CM - 8/13/2012                 Interval Top: 7602 ft.    Interval Bottom: 7770 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/5/2012
Treatment Summary:Set CFP @ 7810'. 03-05-12 Frac'd the Niobrara 7,602’ – 7,770’ (128 holes), w/ 63,840 gals 18 # pHaser Hybrid cross linked gel containing 149,800 # 30/50 sand. 03-05-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7602 ft.# Of Holes:128
Interval Bottom:7770 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/10/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No