Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20711
Well Classification: GW Status: SI - 12/1/2025
Well Name/No:BURY CRANDELL #31-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:423153LocationID:321535
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NENE 23 1N68W 6
Field:WATTENBERG - #90750Elevation:5113 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1056FNL  1036 FELLat/Long: 40.041280 / -104.964920Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041282 / -104.964928Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/2/2012
End Date: 3/2/2012
Reported: 6/27/2012
Prior to rule 205A.b.(2)(A)
Days to report: 117
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2025             Measured TD: 8571 ft.    Vertical TD: 8453 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/11/2013
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 547 FNL  1920 FEL
Bottom Hole Location:Sec:23 Twp: 1N 68W Footage: 547 FNL  1920 FEL
Proposed Depth/Form:8534 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 397, Top: 0 ft., Bottom: 1090 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8534 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 189, Top: 7359 ft., Bottom: 8534 ft.
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5135 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4535 ft., Bottom: 5135 ft.

Wellbore Completed
Completion Date:1/30/2012
Spud Date:1/25/2012Spud Date Is:ACTUAL
Measured TD:8571 ft.Measured PB depth:8493 ft.
True Vertical TD:8453 ft.True Vertical PB depth:8375 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 547 FNL  1920 FEL
Bottom Hole Location:Sec:23 Twp: 1N 68WFootage: 547 FNL  1920 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 1128 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 1128 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8556 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 3970 ft., Bottom: 8556 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4799 ft.
NIOBRARA7574 ft.
CODELL7964 ft.
J SAND8403 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 8414 ft.    Interval Bottom: 8439 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:Frac'd the J-Sand 8414’-8439’, (50 holes)w/ 69,426 gal 18 # pHaser Hybrid cross linked gel containing 250,000 # 20/40 Sand. 03-02-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8414 ft.# Of Holes:50
Interval Bottom:8439 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/26/2012                 Interval Top: 7964 ft.    Interval Bottom: 7984 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/6/2012
Treatment Summary:Set CFP @ 8034'. 03-02-12 Frac'd the Codell 7,964’ – 7,984’ (40 holes) w/ 89,670 gal 22# pHaser Hybrid cross linked gel containing 250,000 # 30/50 sand. 03-06-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7964 ft.# Of Holes:40
Interval Bottom:7984 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/1/2012                  Interval Top: 7574 ft.    Interval Bottom: 8439 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/1/2012
Treatment Summary:Set CBP @ 7540'. 03-28-12 Drilled out CBP @ 7540', CfP @ 7778', 8034' to commingle the JSND-NBRR-CDL. 03-29-12
Tubing Size:2.375 in.Tubing Setting Depth:8381 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 89
BBLS_OIL 38
BTU_GAS 1140
CALC_BBLS_H2O 89
CALC_BBLS_OIL 38
CALC_GOR 11289
CALC_MCF_GAS 429
CASING_PRESS 1485
GRAVITY_OIL 49
MCF_GAS 429
TUBING_PRESS 666
Perforation Data:
Interval Top:7574 ft.# Of Holes:218
Interval Bottom:8439 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 12/1/2025                 Interval Top: 7574 ft.    Interval Bottom: 7984 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7574 ft.# Of Holes:168
Interval Bottom:7984 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/26/2012                 Interval Top: 7574 ft.    Interval Bottom: 7740 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/7/2012
Treatment Summary:Set CFP @ 7778'. 03-06-12 Frac'd the Niobrara 7,574’ – 7,740’ (128 holes), w/ 102,564 gals 18 # pHaser Hybrid cross linked gel containing 264,700 # 30/50 sand. 03-07-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7574 ft.# Of Holes:128
Interval Bottom:7740 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)36
GOR
GOR DeterminationMCFE
Average BOE per Day0.016
Average MCFE per Day0.098

 Federal Financial Assurance  i 

 Tribal Well  i No