Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20711
Well Classification: OW Status: SI - 9/1/2024
Well Name/No:BURY CRANDELL #31-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2024
FacilityID:423153LocationID:321535
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NENE 23 1N68W 6
Field:WATTENBERG - #90750Elevation:5113 ft.
Planned Location:1056FNL  1036 FELLat/Long: 40.041280 / -104.964920Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041282 / -104.964928Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/2/2012
End Date: 3/2/2012
Reported: 6/27/2012
Prior to rule 205A.b.(2)(A)
Days to report: 117
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2024             Measured TD: 8571 ft.    Vertical TD: 8453 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/11/2013
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 547 FNL  1920 FEL
Bottom Hole Location:Sec:23 Twp: 1N 68W Footage: 547 FNL  1920 FEL
Proposed Depth/Form:8534 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 397, Top: 0 ft., Bottom: 1090 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8534 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 189, Top: 7359 ft., Bottom: 8534 ft.
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5135 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4535 ft., Bottom: 5135 ft.

Wellbore Completed
Completion Date:1/30/2012
Spud Date:1/25/2012Spud Date Is:ACTUAL
Measured TD:8571 ft.Measured PB depth:8493 ft.
True Vertical TD:8453 ft.True Vertical PB depth:8375 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 547 FNL  1920 FEL
Bottom Hole Location:Sec:23 Twp: 1N 68WFootage: 547 FNL  1920 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 1128 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 1128 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8556 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 3970 ft., Bottom: 8556 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4799 ft.
NIOBRARA7574 ft.
CODELL7964 ft.
J SAND8403 ft.

Formation JSND                     Formation Classification:                       Status:  SI - 9/1/2024                  Interval Top: 8414 ft.    Interval Bottom: 8439 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:Frac'd the J-Sand 8414’-8439’, (50 holes)w/ 69,426 gal 18 # pHaser Hybrid cross linked gel containing 250,000 # 20/40 Sand. 03-02-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8414 ft.# Of Holes:50
Interval Bottom:8439 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:                       Status:  CM - 6/26/2012                 Interval Top: 7964 ft.    Interval Bottom: 7984 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/6/2012
Treatment Summary:Set CFP @ 8034'. 03-02-12 Frac'd the Codell 7,964’ – 7,984’ (40 holes) w/ 89,670 gal 22# pHaser Hybrid cross linked gel containing 250,000 # 30/50 sand. 03-06-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7964 ft.# Of Holes:40
Interval Bottom:7984 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:                     Status:  CM - 4/1/2012                  Interval Top: 7574 ft.    Interval Bottom: 8439 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/1/2012
Treatment Summary:Set CBP @ 7540'. 03-28-12 Drilled out CBP @ 7540', CfP @ 7778', 8034' to commingle the JSND-NBRR-CDL. 03-29-12
Tubing Size:2.375 in.Tubing Setting Depth:8381 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 89
BBLS_OIL 38
BTU_GAS 1140
CALC_BBLS_H2O 89
CALC_BBLS_OIL 38
CALC_GOR 11289
CALC_MCF_GAS 429
CASING_PRESS 1485
GRAVITY_OIL 49
MCF_GAS 429
TUBING_PRESS 666
Perforation Data:
Interval Top:7574 ft.# Of Holes:218
Interval Bottom:8439 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:                     Status:  SI - 9/1/2024                  Interval Top: 7574 ft.    Interval Bottom: 7984 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7574 ft.# Of Holes:168
Interval Bottom:7984 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:                       Status:  CM - 6/26/2012                 Interval Top: 7574 ft.    Interval Bottom: 7740 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/7/2012
Treatment Summary:Set CFP @ 7778'. 03-06-12 Frac'd the Niobrara 7,574’ – 7,740’ (128 holes), w/ 102,564 gals 18 # pHaser Hybrid cross linked gel containing 264,700 # 30/50 sand. 03-07-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7574 ft.# Of Holes:128
Interval Bottom:7740 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2024 - 01/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9
GOR
GOR DeterminationMCFE
Average BOE per Day0.005
Average MCFE per Day0.024

 Federal Financial Assurance  i 

 Tribal Well  i No