|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/14/2024 Measured TD: 8680 ft. Vertical TD: 8548 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/14/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/20/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 2600 FNL 1325 FWL | | Bottom Hole Location: | Sec:2 Twp: 1N 68W | Footage: 2600 FNL 1325 FWL | | Proposed Depth/Form: | 8659 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8659 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7424 ft., Bottom: 8659 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/2/2011 | | Spud Date: | 5/25/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8680 ft. | Measured PB depth: | 8653 ft. | | True Vertical TD: | 8548 ft. | True Vertical PB depth: | 8521 ft. | | Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 2493 FNL 1301 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 2462 FNL 1317 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1267 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1267 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8667 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 6270 ft., Bottom: 8667 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5863 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 3886 ft., Bottom: 5863 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4984 ft. | | | | | NIOBRARA | 7670 ft. | | | | | CODELL | 8114 ft. | | | | | J SAND | 8564 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/14/2024 Interval Top: 8570 ft. Interval Bottom: 8588 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND 8570'-8588', (36 HOLES) W/ 165,152 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,860# 20/40 SAND 06/20/11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8570 ft. | # Of Holes: | 36 | | Interval Bottom: | 8588 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/20/2023 Interval Top: 8114 ft. Interval Bottom: 8132 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8114 ft. | # Of Holes: | 36 | | Interval Bottom: | 8132 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 7/18/2011 Interval Top: 7670 ft. Interval Bottom: 8588 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/18/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP @ 7610'. 07-13-11. DRILLED OUT CBP @ 7610'. CFP @ 7970' AND 8220' TO COMMINGLE THE JSND-CDL-NBRR. 07-14-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8541 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/18/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 129 | | BBLS_OIL | 80 | | BTU_GAS | 1219 | | CALC_BBLS_H2O | 129 | | CALC_BBLS_OIL | 80 | | CALC_GOR | 3113 | | CALC_MCF_GAS | 249 | | CASING_PRESS | 1664 | | GRAVITY_OIL | 50 | | MCF_GAS | 249 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 232 | | Interval Bottom: | 8588 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: AB - 2/14/2024 Interval Top: 7670 ft. Interval Bottom: 8132 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8220'. 06-20-11. FRAC'D THE CODELL 8114'-8132' (36 HLES) W/ 108,360 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,960# 20/40 SAND. 06-20-11
SET CFP @ 7970' 06-20-11. FRAC'D THE NIOBRARA 7670'-7690', 7854'-7874' (160 HOLES) W/ 131,737 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,060# 20/40 SAND 06-20-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 196 | | Interval Bottom: | 8132 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OG Status: CM - 12/20/2023 Interval Top: 7670 ft. Interval Bottom: 7874 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 160 | | Interval Bottom: | 7874 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/14/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|