|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/31/2023 Measured TD: 8578 ft. Vertical TD: 8480 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/31/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/1/2012 | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 1344 FSL 2608 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 1365 FSL 2603 FEL | Proposed Depth/Form: | 8545 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8545 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 7335 ft., Bottom: 8545 ft. |
| | |
Wellbore Completed | Completion Date: | 10/22/2010 | Spud Date: | 10/15/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8578 ft. | Measured PB depth: | 8532 ft. | True Vertical TD: | 8480 ft. | True Vertical PB depth: | 8434 ft. | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 1344 FSL 2608 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 1365 FSL 2603 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1181 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1181 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8569 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 764, Top: 4120 ft., Bottom: 8569 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4820 ft. | | | | NIOBRARA | 7540 ft. | | | | CODELL | 7962 ft. | | | | J SAND | 8415 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/31/2023 Interval Top: 8414 ft. Interval Bottom: 8430 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/5/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/1/2010 | Treatment Summary: | J-SAND COMPLETION
FRAC J-SAND WITH 159,096 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,000# 20/40 SAND. 11-01-10 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8414 ft. | # Of Holes: | 32 | Interval Bottom: | 8430 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 3/24/2023 Interval Top: 7962 ft. Interval Bottom: 7982 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/5/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7962 ft. | # Of Holes: | 40 | Interval Bottom: | 7982 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 12/8/2010 Interval Top: 7540 ft. Interval Bottom: 8430 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/30/2010 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP@ 7450', 12-03-10 DRILLED OUT CBP @ 7450', CFP @ 7810', 8050', 8070' TO COMMINGLE THE JSND-CDL-NBRR. 12-04-10 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8403 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/8/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 82 | BBLS_OIL | 140 | BTU_GAS | 1251 | CALC_BBLS_H2O | 82 | CALC_BBLS_OIL | 140 | CALC_GOR | 3057 | CALC_MCF_GAS | 428 | CASING_PRESS | 2507 | GRAVITY_OIL | 50 | MCF_GAS | 428 | TUBING_PRESS | 1839 |
| Perforation Data: | Interval Top: | 7540 ft. | # Of Holes: | 200 | Interval Bottom: | 8430 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/31/2023 Interval Top: 7540 ft. Interval Bottom: 7982 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/5/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/30/2010 | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP@8070', 11-01-10 FRAC'D THE CODELL WITH 106,680 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 111,342# 30/50 SAND. 11-30-10.
SET CFP@7850', 11-01-10 DRILLED OUT ON 11-04-10. SET CBP @ 8050'. 11-29-10
SET CFP @ 7810', 11-30-10 FRAC'D THE NIOBRARA WITH 139,986 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,720# 30/50 SAND. 11-30-10 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7540 ft. | # Of Holes: | 168 | Interval Bottom: | 7982 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/24/2023 Interval Top: 7540 ft. Interval Bottom: 7724 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/5/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7540 ft. | # Of Holes: | 128 | Interval Bottom: | 7724 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 05/31/2023 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|