|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2025 Measured TD: 8715 ft. Vertical TD: 8589 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/22/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 1987 FSL 1965 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 1987 FSL 1965 FWL | | Proposed Depth/Form: | 8686 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S2 SEC 26 T1N-R68W | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 SEC 26 T1N-R68W | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S2 SEC 26 T1N-R68W | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1040 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1040 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8686 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 330, Top: 7436 ft., Bottom: 8686 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/3/2011 | | Spud Date: | 10/29/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8715 ft. | Measured PB depth: | 8668 ft. | | True Vertical TD: | 8589 ft. | True Vertical PB depth: | 8542 ft. | | Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 2061 FSL 1973 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 2077 FSL 1984 FWL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1088 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1088 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8703 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 737, Top: 4450 ft., Bottom: 8703 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4952 ft. | | | | | NIOBRARA | 7693 ft. | | | | | CODELL | 8135 ft. | | | | | J SAND | 8571 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2025 Interval Top: 8586 ft. Interval Bottom: 8610 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/2/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/5/2011 | | Treatment Summary: | Frac'd the J-Sand 8586’– 8610’, (48 holes) w/ 65,940 gal 18 # Vistar
Hybrid cross linked gel containing 255,876# 20/40 Sand. 12-05-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8586 ft. | # Of Holes: | 48 | | Interval Bottom: | 8610 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/27/2012 Interval Top: 8135 ft. Interval Bottom: 8154 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/2/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/6/2011 | | Treatment Summary: | Set CFP @ 8200'. 12-06-11
Frac'd the Codell 8135’ – 8154’, (38 holes) w/ 88,788 gal 22 # Vistar Hybrid
cross linked gel containing 243,340 # 30/50 sand. 12-06-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8135 ft. | # Of Holes: | 38 | | Interval Bottom: | 8154 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/10/2012 Interval Top: 7716 ft. Interval Bottom: 8586 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/2/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/10/2012 | | Treatment Summary: | Set CBP @ 7630'. 01-30-12
Drilled out CBP @ 7630', CFP @ 7950', 8200' to commingle the JSND-NBRR-CDL. 01-31-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8573 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 161 | | BBLS_OIL | 96 | | BTU_GAS | 1350 | | CALC_BBLS_H2O | 161 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 5375 | | CALC_MCF_GAS | 516 | | CASING_PRESS | 1110 | | GRAVITY_OIL | 49 | | MCF_GAS | 516 | | TUBING_PRESS | 271 |
| | Perforation Data: | | Interval Top: | 7716 ft. | # Of Holes: | 254 | | Interval Bottom: | 8586 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2025 Interval Top: 7697 ft. Interval Bottom: 8154 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/2/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7697 ft. | # Of Holes: | 206 | | Interval Bottom: | 8154 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/27/2012 Interval Top: 7697 ft. Interval Bottom: 7904 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/2/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/7/2011 | | Treatment Summary: | Set CFP @ 7950'. 12-07-11
Frac'd the Niobrara 7697’ – 7904’ (168 holes), w/ 96,306 gals 18 # Vistar
Hybrid cross linked gel containing 251,160# 30/50 sand. 12-07-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7697 ft. | # Of Holes: | 168 | | Interval Bottom: | 7904 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 9 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.024 |
| Federal Financial Assurance | i | |
|
|