|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/31/2019 Measured TD: 8667 ft. Vertical TD: 8507 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/31/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/29/2012 | | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 510 FNL 1980 FWL | | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 510 FNL 1980 FWL | | Proposed Depth/Form: | 8578 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1120 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 1120 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8578 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 7398 ft., Bottom: 8578 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/17/2010 | | Spud Date: | 9/9/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8667 ft. | Measured PB depth: | 8610 ft. | | True Vertical TD: | 8507 ft. | True Vertical PB depth: | 8445 ft. | | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 524 FNL 1995 FWL | | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 529 FNL 2004 FWL | | Log Types: | CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1175 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 862, Top: 0 ft., Bottom: 1175 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8655 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 787, Top: 4500 ft., Bottom: 8655 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4868 ft. | | | | | NIOBRARA | 7662 ft. | | | | | CODELL | 8056 ft. | | | | | J SAND | 8494 ft. | | | |
Formation JSND Formation Classification: Status: AB - 10/31/2019 Interval Top: 8504 ft. Interval Bottom: 8524 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/27/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J SAND WITH 121968 GAL VISTAR HYBRID CROSS LINKED GEL CONTAINING 250860 # 20/40 SD. 09/27/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8504 ft. | # Of Holes: | 40 | | Interval Bottom: | 8524 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: Status: CM - 12/30/2010 Interval Top: 7662 ft. Interval Bottom: 8524 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/27/2010 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP @ 7568'. 10-06-10. DRILLED OUT CBP @ 7568'. CFP @ 7936' AAND 8176' TO COMMINGLE THE JSND-CDL-NBRR. 10-07-10.
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8489 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/25/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 72 | | BBLS_OIL | 120 | | BTU_GAS | 1324 | | CALC_BBLS_H2O | 72 | | CALC_BBLS_OIL | 120 | | CALC_GOR | 2692 | | CALC_MCF_GAS | 323 | | CASING_PRESS | 2358 | | GRAVITY_OIL | 50 | | MCF_GAS | 323 | | TUBING_PRESS | 1335 |
| | Perforation Data: | | Interval Top: | 7662 ft. | # Of Holes: | 208 | | Interval Bottom: | 8524 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: Status: AB - 10/31/2019 Interval Top: 7662 ft. Interval Bottom: 8076 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/27/2010 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8176'. 09-27-10. FRAC'D THE CODELL WITH 79548 GAL 22# VISTAR CROSS LINKED GEL CONTAINING 250380# 30/50 SD. 09-27-10
SET CFP @ 7936'. 09-27-10
FRAC'D THE NIOBRARA WITH 91728 GAL 18# VISTAR HYBRID CROSS LINKED CONTAINING 250820 # SAND. 09-28-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7662 ft. | # Of Holes: | 168 | | Interval Bottom: | 8076 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/31/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|