|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/1/2025 Measured TD: 8617 ft. Vertical TD: 8441 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/27/2013 | | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 76 FNL 72 FEL | | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 76 FNL 72 FEL | | Proposed Depth/Form: | 8607 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 1090 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8607 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 7432 ft., Bottom: 8607 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5625 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4609 ft., Bottom: 5625 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/23/2011 | | Spud Date: | 12/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8617 ft. | Measured PB depth: | 8524 ft. | | True Vertical TD: | 8441 ft. | True Vertical PB depth: | 8349 ft. | | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 76 FNL 72 FEL | | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 76 FNL 72 FEL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 1108 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1160, Top: 0 ft., Bottom: 1108 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8596 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 775, Top: 3440 ft., Bottom: 8596 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4853 ft. | | | | | NIOBRARA | 7632 ft. | | | | | CODELL | 8022 ft. | | | | | J SAND | 8457 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 3/1/2025 Interval Top: 8468 ft. Interval Bottom: 8493 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/20/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/1/2012 | | Treatment Summary: | Frac'd the J-Sand 8468’-8493’, (50 holes)w/ 63,336 gal 18 # pHaser Hybrid cross
linked gel containing 250,080 # 20/40 Sand. 03-01-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8468 ft. | # Of Holes: | 50 | | Interval Bottom: | 8493 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/6/2012 Interval Top: 8022 ft. Interval Bottom: 8042 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/20/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/1/2012 | | Treatment Summary: | Set CFP 8100'. 03-02-12
Frac'd the Codell 8,022’ – 8,042’ (40 holes) w/ 90,006 gal 22# pHaser Hybrid cross
linked gel containing 148,960 # 30/50 sand. 03-03-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8022 ft. | # Of Holes: | 40 | | Interval Bottom: | 8042 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/20/2012 Interval Top: 7632 ft. Interval Bottom: 8493 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/20/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/20/2012 | | Treatment Summary: | Set CBP @ 7590'. 04-12-12
Drilled out CBP @ 7590', CFP @ 7860', 8100' to commingle the JSND-NBRR-CDL. 04-13-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8432 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 55 | | BTU_GAS | 1348 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 55 | | CALC_GOR | 3382 | | CALC_MCF_GAS | 186 | | CASING_PRESS | 2212 | | GRAVITY_OIL | 50 | | MCF_GAS | 186 | | TUBING_PRESS | 1612 |
| | Perforation Data: | | Interval Top: | 7632 ft. | # Of Holes: | 202 | | Interval Bottom: | 8493 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 3/1/2025 Interval Top: 7632 ft. Interval Bottom: 8042 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/20/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7632 ft. | # Of Holes: | 152 | | Interval Bottom: | 8042 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/6/2012 Interval Top: 7632 ft. Interval Bottom: 7796 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/20/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/1/2012 | | Treatment Summary: | Frac'd the Niobrara 7,632’ – 7,796’ (112 holes), w/ 98,868 gals 18 # pHaser Hybrid cross
linked gel containing 146,500 # 30/50 sand. 03-03-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7632 ft. | # Of Holes: | 112 | | Interval Bottom: | 7796 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1334 |
| Total Gas Produced (MCF) | 10836 |
| GOR | 8122 |
| GOR Determination | BOE |
| Average BOE per Day | 8.737 |
| Average MCFE per Day | 50.678 |
| Federal Financial Assurance | i | |
|
|