|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2024 Measured TD: 8647 ft. Vertical TD: 8447 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/27/2013 | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 2003 FNL 2083 FEL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 2003 FNL 2083 FEL | Proposed Depth/Form: | 8619 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 350, Top: 0 ft., Bottom: 1090 ft. |
| | |
Wellbore Completed | Completion Date: | 2/7/2012 | Spud Date: | 1/31/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8647 ft. | Measured PB depth: | 8603 ft. | True Vertical TD: | 8447 ft. | True Vertical PB depth: | 8403 ft. | Top PZ Location: | Sec:23 Twp: 1n 68w | Footage: 2003 FNL 2083 FEL | Bottom Hole Location: | Sec:23 Twp: 1n 68w | Footage: 2003 FNL 2083 FEL | Log Types: | CBL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1125 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 0 ft., Bottom: 1125 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8632 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 3930 ft., Bottom: 8632 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2500 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 2500 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4900 ft. | | | | NIOBRARA | 7668 ft. | | | | CODELL | 8068 ft. | | | | J SAND | 8512 ft. | | | |
Formation JSND Formation Classification: Status: SI - 9/1/2024 Interval Top: 8518 ft. Interval Bottom: 8543 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/29/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/2/2012 | Treatment Summary: | Frac J-Sand 8518’-8543’, (50 holes)w/ 66,108 gal 18 # pHaser Hybrid cross
linked gel containing 250,020 # 30/50 Sand. 03-02-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8518 ft. | # Of Holes: | 50 | Interval Bottom: | 8543 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 8/13/2012 Interval Top: 8068 ft. Interval Bottom: 8088 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/7/2012 | Treatment Summary: | Set CFP @ 8150. 03-03-12
Frac Codell 8,068’ – 8,088’ (40 holes) w/ 55,020 gal 22# pHaser Hybrid cross
linked gel containing 50,500 # 30/50 sand. 03-07-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8068 ft. | # Of Holes: | 40 | Interval Bottom: | 8088 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/30/2012 Interval Top: 7668 ft. Interval Bottom: 8088 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/30/2012 | Treatment Summary: | Set CBP @ 7620'. 03-22-12
Drilled out CBP @ 7620' and CFP @ 7900', 8150' to commingle the JSND-NBRR-CDL. 03-27-12 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8054 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/30/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 201 | BBLS_OIL | 140 | BTU_GAS | 1273 | CALC_BBLS_H2O | 201 | CALC_BBLS_OIL | 140 | CALC_GOR | 3078 | CALC_MCF_GAS | 431 | CASING_PRESS | 1711 | GRAVITY_OIL | 48 | MCF_GAS | 431 | TUBING_PRESS | 586 |
| Perforation Data: | Interval Top: | 7668 ft. | # Of Holes: | 202 | Interval Bottom: | 8088 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: SI - 9/1/2024 Interval Top: 7668 ft. Interval Bottom: 8088 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/29/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7668 ft. | # Of Holes: | 152 | Interval Bottom: | 8088 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 8/13/2012 Interval Top: 7668 ft. Interval Bottom: 7848 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/7/2012 | Treatment Summary: | Set CFP @ 7900'. 03-07-12
Frac'd the Niobrara 7,668’ – 7,848’ (112 holes), w/ 68,208 gals 18 # pHaser Hybrid cross
linked gel containing 51,820 # 30/50 sand. 03-07-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7668 ft. | # Of Holes: | 112 | Interval Bottom: | 7848 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 02/2024 - 01/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 9 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.005 |
Average MCFE per Day | 0.024 |
Federal Financial Assurance | i | |
|
|