|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 8840 ft. Vertical TD: 8487 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/14/2012 | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 1958 674 | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 2006 692 | Proposed Depth/Form: | 8769 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1090 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8769 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 7578 ft., Bottom: 8769 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5572 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4542 ft., Bottom: 5572 ft. |
| | |
Wellbore Completed | Completion Date: | 11/16/2010 | Spud Date: | 11/8/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8840 ft. | Measured PB depth: | 8748 ft. | True Vertical TD: | 8487 ft. | True Vertical PB depth: | 8395 ft. | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 1958 FNL 674 FWL | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 2006 FNL 692 FWL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1353 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 495, Top: 0 ft., Bottom: 1353 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8802 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 665, Top: 4470 ft., Bottom: 8802 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5070 ft. | | | | NIOBRARA | 7854 ft. | | | | CODELL | 8242 ft. | | | | J SAND | 8676 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 8678 ft. Interval Bottom: 8694 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/15/2010 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND W/ 154,812 GAL 16# VISTAR HYBRID X-LINKED GEL CONTAINING 250,800# 20/40 SAND. 12/10/10 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8678 ft. | # Of Holes: | 28 | Interval Bottom: | 8694 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/27/2010 Interval Top: 7854 ft. Interval Bottom: 8694 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/27/2010 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SWET CBP @ 7840'. 12-17-10. DRILLED OUT CBP @ 7840'M CFO @ 8130' AND 8340' TO COMMINGLE THE JSND-CDL-NBRR. 12-18-10. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8665 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/27/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 152 | BBLS_OIL | 77 | BTU_GAS | 1169 | CALC_BBLS_H2O | 152 | CALC_BBLS_OIL | 77 | CALC_GOR | 9740 | CALC_MCF_GAS | 750 | CASING_PRESS | 2296 | GRAVITY_OIL | 55 | MCF_GAS | 750 | TUBING_PRESS | 1243 |
| Perforation Data: | Interval Top: | 7854 ft. | # Of Holes: | 264 | Interval Bottom: | 8694 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 7854 ft. Interval Bottom: 8260 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/16/2010 | Treatment Summary: | CD-NB COMPLETION. SET CFP@8840' FRAC'D CD W/109,326 GAL 22# VISTAR HYBRID X-LINKLED GEL CONTAINING 260,680# 20/40 SAND 12/10/10. SET CFP@8130' FRAC'D NB W/139,944 GAL 18# VISTAR HYBRID X-LINKED GEL CONTAINING 250,680# 20/40 SAND. 12/10/10 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7854 ft. | # Of Holes: | 236 | Interval Bottom: | 8260 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 22 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.011 |
Average MCFE per Day | 0.060 |
Federal Financial Assurance | i | |
|
|