Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20670
Well Classification: GW Status: SI - 7/1/2025
Well Name/No:CRANDELL #24-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2025
FacilityID:413041LocationID:321529
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSW 26 1N68W 6
Field:SPINDLE - #77900Elevation:5217 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1725FSL  1008 FWLLat/Long: 40.019630 / -104.976540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.019611 / -104.976547Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/22/2011
End Date: 11/22/2011
Reported: 2/15/2012
Prior to rule 205A.b.(2)(A)
Days to report: 85
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2025             Measured TD: 8800 ft.    Vertical TD: 8589 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/24/2013
Proposed Top PZ Location:Sec:26 Twp: 1N 68W Footage: 810 FSL  2130 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68W Footage: 810 FSL  2130 FWL
Proposed Depth/Form:8782 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1040 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: , Bottom: 1040 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8782 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 320, Top: 7390 ft., Bottom: 8782 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5830 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 260, Top: 4762 ft., Bottom: 5830 ft.

Wellbore Completed
Completion Date:10/16/2011
Spud Date:10/10/2011Spud Date Is:ACTUAL
Measured TD:8800 ft.Measured PB depth:8738 ft.
True Vertical TD:8589 ft.True Vertical PB depth:8527 ft.
Top PZ Location:Sec:26 Twp: 1N 68WFootage: 788 FSL  2080 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68WFootage: 783 FSL  2119 FWL
Log Types:CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1086 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 398, Top: 0 ft., Bottom: 1086 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8788 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 685, Top: 4400 ft., Bottom: 8788 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5061 ft.
NIOBRARA7805 ft.
CODELL8244 ft.
J SAND8674 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 7/1/2025                  Interval Top: 8690 ft.    Interval Bottom: 8710 ft.

 Completed Information for Formation J SAND
1st Production Date:2/11/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/2011
Treatment Summary:Frac'd the J-Sand 8690’– 8710’, (40 holes) w/ 59,262 gal 18 # Vistar Hybrid cross linked gel containing 251,480 20/40 Sand. 11-22-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8690 ft.# Of Holes:40
Interval Bottom:8710 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/27/2012                 Interval Top: 8244 ft.    Interval Bottom: 8262 ft.

 Completed Information for Formation CODELL
1st Production Date:2/11/2012Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/2011
Treatment Summary:Set CFP @ 8320'. 11-22-11. Frac'd the Codell 8244’ – 8262’, (36 holes) w/ 88,074 gal 22 # Vistar Hybrid cross linked gel containing 250,020 # 30/50 sand. 11-22-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8244 ft.# Of Holes:36
Interval Bottom:8262 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/12/2012                 Interval Top: 7810 ft.    Interval Bottom: 8710 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/11/2012Choke Size:14.000 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/12/2012
Treatment Summary:Set CBP @ 7760'. 02-08-12. Drilled out CBP @ 7760', CFP @ 8080', CFP @ 8320' to commingle the JSND-NBRR-CDL. 02-09-12
Tubing Size:2.375 in.Tubing Setting Depth:8676 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/12/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 146
BBLS_OIL 60
BTU_GAS 1193
CALC_BBLS_H2O 146
CALC_BBLS_OIL 60
CALC_GOR 5633
CALC_MCF_GAS 338
CASING_PRESS 414
GRAVITY_OIL 49
MCF_GAS 338
TUBING_PRESS 1622
Perforation Data:
Interval Top:7810 ft.# Of Holes:268
Interval Bottom:8710 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 7/1/2025                  Interval Top: 7810 ft.    Interval Bottom: 8262 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/11/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7810 ft.# Of Holes:228
Interval Bottom:8262 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/27/2012                 Interval Top: 7810 ft.    Interval Bottom: 8017 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/11/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/2011
Treatment Summary:Set CFP @ 8080'. 11-22-11. Frac'd the Niobrara 7810’ – 8017’ (192 holes), w/ 97,818 gals 18 # Vistar Hybrid cross linked gel containing 251,140# 30/50 sand. 11-22-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7810 ft.# Of Holes:192
Interval Bottom:8017 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13
GOR
GOR DeterminationMCFE
Average BOE per Day0.008
Average MCFE per Day0.035

 Federal Financial Assurance  i 

 Tribal Well  i No